🚧 OBRAS ESTACIÓN ATOCHA: ¿ABRIRÁN POR FIN LA MARQUESINA HISTÓRICA? | 16 JULIO 2026 🚧

#madrid #madridcapital #atocha #trainstation #adif #madridcentro #madridspain Another visit to the Atocha station construction site, and although there aren't any major developments, today I saw something that really caught my eye. I don't think it was like this two weeks ago, at least I don't recall it, and it's something that immediately makes you think. They've removed the white tarp that had been in place for so long on the north side of the historic canopy. It was put up to separate the area occupied by the slab from the rest of the building, and now it's gone. If I tell you it's been three years, I might even be understating it. There's even a small vantage point on the first floor, near the south entrance to the canopy, from where you can see the north side. I repeat, a small and distant vantage point. But you can see that the tarp is gone, you can see the side walkway, and you can even see a bit of what lies beyond the north facade of the building. That makes me think the opening could be near, very near. I don't know if it will be in July, as they told me back in May, but it feels like they're making giant strides, even if they aren't visually striking. They're also continuing work on the section that connects the historic canopy with the commercial area of ​​Atocha, which then leads to the commuter rail and the Metro. Two weeks ago, they were already installing the first pieces of a kind of false ceiling, and today there was even a section with the new lighting. A bit dim for my taste, but perhaps it will look better once all the pieces are installed and all the lights are working. There's still work to be done; there's still a lot of material to be added outside, but I wouldn't dare say they won't open everything before the end of the month. As for the new access points, well, everything is progressing more and more. There are new bushes and new trees, the benches have arrived, there are handrails on the ramps and stairs, lots of exposed brick... In just three months, they've done almost everything, and it also seems like there's not much left to finish. I don't know if it will be in two weeks, but perhaps by August. And everything should connect more seamlessly with the interior, accessible through the doors on the north facade. We're all eager to see it finished after so many years. P3B is still closed, and every time I see it, I understand less why it's not operational. Today, from the outside, there was nothing left to indicate that anything remains to be done. Remove a few things and that's it. Everything is perfect, well-painted, and well-finished. It makes me think that perhaps they won't open it until the new VIP lounge is finished, although I don't see the connection. Perhaps opening the new lounge will mean permanently closing P2 and opening P3B. I'm not sure. At the same time, the seemingly complete framework of the new platform is already visible. It will probably all be concreted by the next visit, in two weeks. They're also excavating a little further south of where they've already built the new platform, so I don't think it will be too long before we see new pillars to support it. And finally, the four new sidings and the commuter rail works. The four tracks are still only two, although it seems the other two are well underway, and the commuter rail works are nearing completion. They will transition to the new 4-3-3 configuration, improving the capacity of the Sol tunnel. All of this should mean an improvement for commuter rail users in Madrid. Happy Thursday! Become a member of this channel to enjoy perks:    / @viajareslomio   If you liked the video, don't hesitate to give it a "Like" 👍 and subscribe to the channel ✅. Follow us on social media! ▶️ TikTok:   / viajareslomio   ▶️ Instagram:   / viajareslomio   ▶️ Facebook:   / viajareslomio   ▶️ Twitter: https://x.com/Viajareslomio ▶️ Book your hotel: https://www.booking.com/index.html?ai... ▶️ Shop: https://www.latostadora.com/shop/viaj...

🚧 SUMMER FULL of WORKS at ATOCHA STATION 🚧 Commuter Rail Track Upgrades / Sol Tunnel / Madrid
▶︎

🚧 SUMMER FULL of WORKS at ATOCHA STATION 🚧 Commuter Rail Track Upgrades / Sol Tunnel / Madrid

🚧 A-5 UNDERGROUND PROJECT: LOS YÉBENES HILLS ARE DISAPPEARING | JULY 13, 2026 🚧
▶︎

🚧 A-5 UNDERGROUND PROJECT: LOS YÉBENES HILLS ARE DISAPPEARING | JULY 13, 2026 🚧

XPENG L03: WHAT A DISAPPOINTMENT 😢
▶︎

XPENG L03: WHAT A DISAPPOINTMENT 😢

KYIV PROTESTS🪧Counteroffensive in Zaporizhzhia⚔️Russians Near Kramatorsk🎯Black Sea War🔥MS 17.07.2026
▶︎

KYIV PROTESTS🪧Counteroffensive in Zaporizhzhia⚔️Russians Near Kramatorsk🎯Black Sea War🔥MS 17.07.2026

Grupo ACS Colección Ciudades | La construcción del actual Madrid
▶︎

Grupo ACS Colección Ciudades | La construcción del actual Madrid

American Reacts to How German Houses are Built! *INSANE*
▶︎

American Reacts to How German Houses are Built! *INSANE*

The Spanish CATOBAR aircraft carrier: what Navantia is designing
▶︎

The Spanish CATOBAR aircraft carrier: what Navantia is designing

ТРАГЕДИЯ! 3 чел. погибли, ОТРАВИЛИСЬ 200 чел., Контроль чатов, Призыв к ОТСТАВКЕ, Новости Германии
▶︎

ТРАГЕДИЯ! 3 чел. погибли, ОТРАВИЛИСЬ 200 чел., Контроль чатов, Призыв к ОТСТАВКЕ, Новости Германии

Hamburg's Mega Projects: Billion-Dollar Bridge, Elbtower & Opera
▶︎

Hamburg's Mega Projects: Billion-Dollar Bridge, Elbtower & Opera

The Most Satisfying Machines That Are At Another Level!
▶︎

The Most Satisfying Machines That Are At Another Level!

🚧 ATOCHA STATION CONSTRUCTION: COUNTDOWN TO THE NEW ENTRANCES | JUNE 18, 2026 🚧
▶︎

🚧 ATOCHA STATION CONSTRUCTION: COUNTDOWN TO THE NEW ENTRANCES | JUNE 18, 2026 🚧

Vlog Semana 28-29 F1 GP ESPAÑA - EL GRAN PREMIO AUN EN PAÑOS MENORES
▶︎

Vlog Semana 28-29 F1 GP ESPAÑA - EL GRAN PREMIO AUN EN PAÑOS MENORES

🚧 A-5 UNDERGROUND: UNDERPASSES AND TUNNEL CONNECTIONS ARE PROGRESSING | JUNE 15, 2026 🚧
▶︎

🚧 A-5 UNDERGROUND: UNDERPASSES AND TUNNEL CONNECTIONS ARE PROGRESSING | JUNE 15, 2026 🚧

BERLIN to PARIS on Europe’s AWFUL New Sleeper Train!
▶︎

BERLIN to PARIS on Europe’s AWFUL New Sleeper Train!

🚧 ATOCHA STATION CONSTRUCTION: NEW HIGH-SPEED PLATFORM WORKS RESUME | JULY 2, 2026 🚧
▶︎

🚧 ATOCHA STATION CONSTRUCTION: NEW HIGH-SPEED PLATFORM WORKS RESUME | JULY 2, 2026 🚧

I Was NOT Ready for German Police Code 3… (American Reaction)
▶︎

I Was NOT Ready for German Police Code 3… (American Reaction)

💥 EVERYONE visits this place in the PICOS DE EUROPA 😳 Is it overrated? | Camping route
▶︎

💥 EVERYONE visits this place in the PICOS DE EUROPA 😳 Is it overrated? | Camping route

10 Secret Places in Northern Spain That Almost NO ONE Knows
▶︎

10 Secret Places in Northern Spain That Almost NO ONE Knows

If These Train Moments Weren’t Filmed, Nobody Would Believe Them
▶︎

If These Train Moments Weren’t Filmed, Nobody Would Believe Them

Canadian Reacts To This is Germany
▶︎

Canadian Reacts To This is Germany