🚧 SOTERRAMIENTO DE LA A-5: DESAPARECEN LAS COLINAS DE LOS YÉBENES | 13 JULIO 2026 🚧

#madrid #urbanmobility #sustainability #madridspain #madridcapital Another visit to the A-5 undergrounding works and we have another development that the city council announced last week and which is already becoming visible. The three hills near the Yébenes underpass, next to the electrical substation, will have their height considerably reduced. In fact, they will go from 18 meters to just 6 meters, which I think is great news. They looked like little monsters in an area that previously had nothing, and they obstructed the view of the buildings located just to the south. Furthermore, it has also been revealed that the earth removed from there will be used to cover the underpasses that are not yet fully completed. It will be used to cover them so that they are as well concealed as the two tunnels, so that we won't see them for a while. And we won't see them for a while, because look at the Batán underpass, which has changed a lot since our last visits. If you recall, two weeks ago the underpass was already fully roofed, but a good portion of the reinforcement structure above still needed to be built. Well, not only is it all finished, but it's also almost entirely covered by the aforementioned earth, so you can barely see any concrete anymore. They've done it in no time, and I imagine the work inside will also take little time so that it's practically a tunnel. Or two. As for the other two underpasses, the one on the Boadilla Road is difficult to see, to be honest. I can barely see anything from the car, although it does seem like it won't be long before it's completely closed. Today I think they were pouring concrete for the central wall, but I only think so. It's getting more and more closed, because it was also the largest of the three, and I wouldn't be surprised if they finished it during the first few days of August. The one in Los Yébenes offers a bit more visibility, and some interesting things at that. The central wall is finished; you can see the rebar perfectly. But the best part isn't that; it's all the material accumulated nearby, which will be used for the slab's formwork. This way, the underpass can be permanently closed and then covered with earth, just like in Batán. Then there's the connection between the old and new tunnels, where there's also been significant progress. They're finishing pouring the concrete for the wall that will support the slab in the northern area, so they'll probably start working on the central wall this month. The reinforcement bars and formwork panels were visible, and when I left, they were pouring concrete with the help of the mobile crane that was in the area. They're working quickly, but there's still quite a bit to do. Finally, the surface work has now reached the area where the northern tunnel exits onto the Boadilla road. They've already installed the curbs and poured the base for paving those two lanes that will run above ground in the not-too-distant future. I think the intention is for city buses to start running there as soon as possible, because we have to remember that these buses won't be going through the tunnels, unlike the intercity buses. Happy Monday! Become a member of this channel to enjoy perks:    / @viajareslomio   If you liked the video, don't hesitate to give it a "Like" 👍 and subscribe to the channel ✅. Follow us on social media! ▶️ TikTok:   / viajareslomio   ▶️ Instagram:   / viajareslomio   ▶️ Facebook:   / viajareslomio   ▶️ Twitter: https://x.com/Viajareslomio ▶️ Book your hotel: https://www.booking.com/index.html?ai... ▶️ Shop: https://www.latostadora.com/shop/viaj...

🚧 CIUDAD DEL DEPORTE: THE SHOPPING CENTER NOW HAS TWO CRANES | JULY 14, 2026 🚧
▶︎

🚧 CIUDAD DEL DEPORTE: THE SHOPPING CENTER NOW HAS TWO CRANES | JULY 14, 2026 🚧

Jul 13. STADIUM NAME INSTALLATION IMMINENT. LED BANNER AND NOISE-CANCELING DOORS PROGRESSING
▶︎

Jul 13. STADIUM NAME INSTALLATION IMMINENT. LED BANNER AND NOISE-CANCELING DOORS PROGRESSING

🚧 VENTAS PARK: NEW ACCESS RAMPS PROGRESSING | JULY 10, 2026🚧
▶︎

🚧 VENTAS PARK: NEW ACCESS RAMPS PROGRESSING | JULY 10, 2026🚧

Monólogo de Alsina: "El Gobierno se da por condenado"
▶︎

Monólogo de Alsina: "El Gobierno se da por condenado"

ASCH finaliza las obras de la Autovía A-11 | Tramo Burgo de Osma – San Esteban de Gormaz (Soria)
▶︎

ASCH finaliza las obras de la Autovía A-11 | Tramo Burgo de Osma – San Esteban de Gormaz (Soria)

El secreto de MERCADONA para ganar 40.000 MILLONES
▶︎

El secreto de MERCADONA para ganar 40.000 MILLONES

If These Train Moments Weren’t Filmed, Nobody Would Believe Them
▶︎

If These Train Moments Weren’t Filmed, Nobody Would Believe Them

🚧 CASTELLANA PARK: THE MONUMENTAL PERGOLA IS TAKING SHAPE | JULY 7, 2026 🚧
▶︎

🚧 CASTELLANA PARK: THE MONUMENTAL PERGOLA IS TAKING SHAPE | JULY 7, 2026 🚧

10 Secret Places in Northern Spain That Almost NO ONE Knows
▶︎

10 Secret Places in Northern Spain That Almost NO ONE Knows

What The Greenland Tipping Point Will Do To Earth By 2030
▶︎

What The Greenland Tipping Point Will Do To Earth By 2030

¿Dónde están los trenes exprés en Cercanías Madrid?
▶︎

¿Dónde están los trenes exprés en Cercanías Madrid?

Probando el queso con carbón, a este paso nos quedamos sin río
▶︎

Probando el queso con carbón, a este paso nos quedamos sin río

How Workers Built a Cliff-Hanging Railroad Through Colorado’s Royal Gorge
▶︎

How Workers Built a Cliff-Hanging Railroad Through Colorado’s Royal Gorge

Every Rank in the Roman Legion Explained
▶︎

Every Rank in the Roman Legion Explained

🚧 A-5 UNDERGROUND: UNDERPASSES AND TUNNEL CONNECTIONS ARE PROGRESSING | JUNE 15, 2026 🚧
▶︎

🚧 A-5 UNDERGROUND: UNDERPASSES AND TUNNEL CONNECTIONS ARE PROGRESSING | JUNE 15, 2026 🚧

🔥 SECOND LED RING HIGHLY ADVANCED ⚠️ BERNABEU CONSTRUCTION (July 15, 2026)
▶︎

🔥 SECOND LED RING HIGHLY ADVANCED ⚠️ BERNABEU CONSTRUCTION (July 15, 2026)

WILL SUVs DISAPPEAR? YES!
▶︎

WILL SUVs DISAPPEAR? YES!

Grupo ACS Colección Ciudades | La construcción del actual Madrid
▶︎

Grupo ACS Colección Ciudades | La construcción del actual Madrid

🚧 A-5 TUNNELING PROJECT: BATÁN UNDERPASS IS ALREADY BEING COVERED | JUNE 29, 2026 🚧
▶︎

🚧 A-5 TUNNELING PROJECT: BATÁN UNDERPASS IS ALREADY BEING COVERED | JUNE 29, 2026 🚧

The 7 Worst Generals of World War 2
▶︎

The 7 Worst Generals of World War 2