Gettysburg Historic Architectural Review Board (HARB) - 07/15/2026
HISTORIC ARCHITECTURAL REVIEW BOARD (HARB) AGENDA Wednesday – July 15, 2026, at 7:00 PM in Troxel Council Chambers 1. Call meeting to order 7:00 PM. 2. Review and Approval of Agenda & Meeting Minutes A. A motion to approve the Business Meeting Agenda of July 15, 2026 B. A motion to approve the Meeting Minutes of June 30, 2026 3. Public Comment 4. Consent Agenda Motion to Approve: A. COA 26-00300 CRITICAL PROJECT – 252 Baltimore Street – John Buchheister Installation of new roof material from 3-tab asphalt shingle to architectural shingle material (Tanko Titan). B. COA 26-00313 CRITICAL PROJECT – 252 1/2 Baltimore Street – John Buchheister Installation of new roof material from 3-tab asphalt shingle to architectural shingle material (Tanko Titan). C. COA 26-00330 CRITICAL PROJECT – 40 W. High Street – Philip Fazenbaker Demolition of unsafe rear accessory structure/garage resulting from a vehicle collision. D. COA 26-00335 MAJOR PROJECT – 631 S. Washington Street – John Merrell Installation of new black aluminum railings (Freedom Margate). New concrete steps. New 4"x4" porch. 5. Old Business: N/A 6. New Business: A. COA 26-00220 CRITICAL PROJECT – 619 Baltimore Street – Joseph Warner Demolition of rear gazebo/accessory structure. B. COA 26-00316 CRITICAL PROJECT – 114 Buford Avenue – Chris Garliss Remove existing vinyl siding and replace with 8-1/4-inch, 7-inch reveal HardiPlank siding. JOR PROJECT – 200 York Street – Troy Nunemaker Construction of a 392 square foot (14’x28’) T1-11 wood siding, accessory structure to the rear of the existing principal structure. D. COA 26-00324 MAJOR PROJECT – 150 Carlisle Street – Muhammad Ashraf Construction of a 600 square foot (20’x30’) 8-foot-tall metal accessory structure to the rear of the existing principal structure. E. COA 26-00346 CRITICAL PROJECT – 111 N. Stratton Street – Tim Harrison Construction of a 16’ x 32’ bus transit center with a total coverage area expanded with a 16’x80’ canopy roof. Associated with Gettysburg Station Subdivision and Land Development Plan. F. Chapter 11 Historic District Ordinance Recommendation. 7. Reports A. Administrative COA Approvals from the last meeting – Ordinance 11-108 Duties and Responsibilities [Ord.1118-91, 8/12/1991, & 108] Certificates of Appropriateness approved administratively since the last HARB meeting: 1. COA 26-00332 Minor Project – 631 S. Washington Street Installation of new decking tongue and groove, install new lattice, install new 2x8 floor joists. B. Report of Chair C. Report of Staff 8. Public Comment 9. Adjournment NOTE: HARB is a DESIGN review board only, each project must meet all other Borough Ordinance and Building Code Requirements prior to final approval through Borough Council on the 2nd Monday of the following month.

Meade at Gettysburg: Battle through Meade's Eyes | Illustrated Map | Battle of Gettysburg

Gettysburg Borough Council Meetings - 07/13/2026

Hanover Borough Council Finance & Personnel Committee - 07/15/2026

We Bought a $1,000 Abandoned CAT 400 Haul Truck

LIVE 🔴| Tropical Depression 2 Has Formed - Latest Track & Forecast

Spanien – Argentinien Highlights | Finale, FIFA WM 2026 | sportstudio

Hunter Biden says being ‘stripped naked in the public square’ was a gift | Newsmakers

Gettysburg 6: Evening Day One: Arrivals & New Battlelines | Slocum & Johnson arrive | Gettysburg

Planning Commission 7/7/2026

July 14, 2026 Plan Commission Meeting

Eyes to See Ministries Podcast - Episode 04: Rapture

What Xi Jinping Wants | The Ezra Klein Show

BREAKING: US launches 9th night of strikes on Iran

Town Council Meeting - 07/16/2026

Little Round Top Tour (Post-Rehab) | Gettysburg 161

2026-07-14 Village Board of Trustees Meeting

CRA Meeting 07/13/2026 5:30 PM

DOJ’s Epstein Defense Just Backfired in Court (w/ Andrew Weissmann) | Illegal News

How America Recovers from All This | Yale Conversations with David Brooks | Yale University

