御母衣ロックフィルダム 第一部
Summary Produced by: Eigasha Film Company, Planned by: Hazama Corporation 1961, Color, 47 minutes A plan was made to build a dam in the Miboro area of the Shogawa River, which flows from Oku-Hida to the Sea of Japan, and to use the water from the dam's huge artificial lake, with a storage capacity of 370 million tons, to construct a hydroelectric power plant with a maximum output of 215,000 kilowatts. The construction project was a complex undertaking, fraught with various challenges, including bedrock, soft ground, and poor building materials. This film documents the construction.

▶︎
Miboro Rockfill Dam, Part Two

▶︎
Miboro Rockfill Dam Part 2

▶︎
関門橋の架設
![Immersed tunnel across the Tama River [JRTT Railway and Transport Organization]](https://i.ytimg.com/vi/mdvnORJ2mbU/hqdefault.jpg?sqp=-oaymwEjCNACELwBSFryq4qpAxUIARUAAAAAGAElAADIQj0AgKJDeAE=&rs=AOn4CLAnINlEf5cfqaoc98OA1JFySiyC9A)
▶︎
Immersed tunnel across the Tama River [JRTT Railway and Transport Organization]

▶︎
The Secret German Aviation Facilities That Shaped WWII | Rare Archival Films Series

▶︎
Amazing Recycling Process of Electric Motor Scrap Into Manufacturing New Quality Copper Materials

▶︎
いどむ

▶︎
Inside the World's Most Advanced Sawmills | How Giant Trees Become Wooden Pallets

▶︎
The History Of Daring Aviators Who Shrank the Globe, Restored Rare Footage

▶︎
弾丸鉄道 新丹那トンネル 二部

▶︎
Meishin Expressway

▶︎
佐久間ダム建設記録 第一部

▶︎
海中基礎にいどむ -明石海峡大橋ケーソン設置-

▶︎
只見川 第2部

▶︎
Why Roads Get Washboards

▶︎
#昭和の東京シリーズ 第1回 小河内ダム ~ダムに沈む小学校~(昭和32年9月)

▶︎
It's finally finished, but no water is accumulating!? But actually, that's for the best! A visit ...

▶︎
青函トンネル【JRTT鉄道・運輸機構】

▶︎
Dangerous Grindstone Installation in 1971

▶︎
