Torf stechen im Fundament

Our high-voltage power line is creating a crackling atmosphere. Is that healthy? After a period of rain, the weather is temporarily drier again, and we can continue with our foundation project. First, the peat has to be removed from the top layer, and then from a depth of 6 meters. Drilling through peat is always difficult. We received a delivery of sand, so the next section can be poured. Unfortunately, there are problems with the forced-action mixer, which simply shuts off when it's full and the mixture is already mixed. There will be another video about this problem later, as I wasn't able to film it due to time constraints. Music: Return Of The Conqueror www.Allesgemafrei.de The Trapezist – Quincas Moreira Music royalty-free