Schleuse Kriegenbrunn: Start der Bohrungen
Here it is: large, imposing, and brand new: We're talking about Germany's largest drilling rig, weighing 200 tons and standing 36.3 meters tall. This magnificent machine will be used nowhere else but in Erlangen. More precisely: at the construction site of the new Kriegenbrunn lock, for an important task. It is one of 16 locks that will allow ships to overcome a 243-meter difference in elevation on the waterway.

▶︎
Höchste Schleuse Deutschlands: Ein Blick auf den Main-Donau-Kanal

▶︎
Germany's largest drilling rig is used in Kriegenbrunn I BR24

▶︎
XXL tunnel boring machines for the energy transition | The North Report | NDR Documentary

▶︎
SCHIFFFAHRT: Großputz in der Schleuse Hilpotstein - Mega Aufwand mit Wow-Effekt | Magazin

▶︎
Baugruben im Großformat für Schleuse Kriegenbrunn | BAUER Spezialtiefbau GmbH

▶︎
Worst Plane Landing Fails Caught on Camera

▶︎
Die Schleusenruine von Wüsteneutzsch | Galileo | ProSieben

▶︎
Schleuse Lüneburg

▶︎
XXL-Schiffshebewerk Niederfinow begeistert Technikfans aus aller Welt | DW Nachrichten

▶︎
Wasser marsch - neue Schleuse Gleesen am Dortmund-Ems-Kanal geflutet

▶︎
Watch This 300,000-Ton Ship Disappear | The Final Moments of a Stellar Banner long version HD

▶︎
Wie funktioniert eine Schleuse?

▶︎
These animals are released into the wild for the first time

▶︎
Excavators, cranes, sailboats: Lock construction on the Elbe | The North Report | NDR Documentary

▶︎
Ships of the Future: The Coming Revolution in the Shipping Industry | FD Engineering

▶︎
The Future of Global Shipping: Back to the Sail 2.0? | FD Finance

▶︎
Sperrung Main-Donau-Kanal: Start in Nürnberg-Eibach

▶︎
Norway is Building The World's Deepest Mega-Tunnel

▶︎
SuedLink: Will Germany’s longest construction project ever be finished?

▶︎
