Blast Furnace 5 Life Extension Project - Tim Rutter steps inside the furnace!
Down at Blast Furnace 5, the pig beds are currently being dried out to prepare for the 650 tonnes of liquid iron that will drain onto them shortly. The virtual reality designs are now a physical reality , Head of Communications Tim Rutter runs us through exactly what will be happening over the next couple of days.

▶︎
Blast furnace Revamping

▶︎
Chancellor of the Exchequer, Hugh Gaitskill, opens Port Talbot Steelworks 1951

▶︎
Blast Furnace 5 Life Extension Project - Meet Thomas Ashton Lewis, Team Member

▶︎
Salamander tapping BFB Ougrée Belgium

▶︎
Exploring the Abandoned Redcar Blast Furnace

▶︎
Final movements at Tata Steel UK's Blending Plant

▶︎
How STEEL is MADE in Great Britain!

▶︎
Europe’s Biggest Blast Furnace - A colossus being made fit for the future | Made in Germany

▶︎
eksport chlakovoz

▶︎
"Illawarra Coke"

▶︎
Alec Steele's visit to Tata Steel

▶︎
Heavy Machinery & Equipment Handling Blast-furnace And Steel Slag At Metallurgical And Steel Mills

▶︎
Rust Belt Ruins: The Carrie Blast Furnace

▶︎
Blast Furnace 5 Life Extension Project - Meet Paul Evans, Project Operational Lead

▶︎
The Last Cast - the death of steelmaking on Teesside

▶︎
Extreme Tech JSW Blast furnace | The marvel of engineering

▶︎
Michael Sheen: The Fight For My Steel Town

▶︎
Preparing a Cupola for Charging

▶︎
Blast Furnace taphole drilling

▶︎
