Rail Baltica construction progress at RIX Riga Airport | May 2026
In the first half of 2026, Rail Baltica construction works at RIX Riga Airport have continued across a wide area — from the demolition of the cargo centre hangar to the construction of viaduct structures. In this video, we take a look at the progress achieved so far: • the cargo centre hangar on Ziemeļu Street has been demolished; • the installation of 147 weathering steel beams has been completed along a 500-metre section from the station building to Ziemeļu Street; • installation of reinforced concrete side shielding elements has started; • works are continuing next to the airport’s 4th apron construction site, including the construction of piles and supports. Take a look at the latest Rail Baltica construction progress at RIX Riga Airport!

Jaunās Rīgas Centrālās stacijas dienvidu daļas būvniecības progress | 2026. gada jūnijs

Construction progress of the southern part of the new Riga Central Station | June 2026

Rail Baltica kavēšanās: Latvijai jāpieņem lēmumi

Russia closes border rail crossings amid Baltic tensions | DW News

2025. gads - Rail Baltica Latvijā pāriet uz aktīvu būvniecību pamattrasē

Rail Baltica pamattrases pievedceļu būvdarbi

Germany is in big trouble

Is Rail Baltica Still Worth It After Costs Quadrupled?

Rail Baltica Progress in Lithuania: Q2 2026

Rail Baltica I May review 2026

The Underwater Tunnel That Could Connect Europe and Africa

The Complete Story of the Belgrade-Budapest High-Speed Rail Project

A new coupling for all freight trains in Europe – can that really work?

TV3 uudised: Rail Balticu tähtaeg libiseb käest! Suurim murekoht on raha

Never Buy a Water Pump Again! A 65-Year-Old Plumber Made His Own Water Pump Using PVC Pipes | Update

Why a 3.5 Inch Difference in Rail Width Is a $27B Problem for NATO | WSJ Breaking Ground

Most Incredible Cruise Ship Videos Ever Captured

TV3 uudised: Rail Baltic sõlmis pöörangute ehitamiseks lepingu, aga paigaldada neid veel ei saa

Koridor 5C Nemila - Vranduk

