Trainz 2022 Eagle River Rwy S2 E33: Busy Afternoon

In this Eagle River Railway operations episode, we kick things off in the Beaver Cove Yard as our road locomotive tucks in behind its string of cars, clearing the way for the switcher to begin moving loads toward the unloading area. From there we head up to the Beaver Cove depot to catch the Northern Pacific Train #5 Eagle River section and ride along as it begins its final run to Keane. Over in Keane, the local freight has arrived, allowing us to dispatch the empties train to the Logging Camp A staging yard where it swaps cars with the waiting loaded string. After holding for Train #5 to pass, the loaded log train begins its journey back toward Beaver Cove Yard while we take the empties up to Logging Camp A. We wrap up the session in Keane, assisting Northern Pacific passenger Train #5 as it positions at the platform. This episode is packed with realistic switching, log train movements, yard operations, and mainline action across the Eagle River Railway. #trainsim #modelrailroad