É só isso que falta para a VLT de SALVADOR?
In February 2021, the old suburban trains were deactivated, and the population lost a R$ 0.50 transport option, being forced to pay R$ 5.60 on buses — a brutal increase of 1,000%. Five years later, the promise finally becomes a reality: Salvador's Light Rail Transit (VLT) is running in tests, and the population will be using it in 2026. On April 2, 2026, Lula and Governor Jerônimo visited Salvador and witnessed the unprecedented: sections of the VLT operating in tests at Praça Onze de Dezembro. It was no longer a promise — these were modern trains running on energized tracks. The West Expansion of the system was authorized, and the service order for the metro was signed. CONSTRUCTION PROGRESS: Section 1 (Ilha São João-Calçada-Comércio): 60% completed, 21 km of permanent track, 4 km energized, operational tests underway NOW. Section 2 (Paripe-Águas Claras): 40% complete, receiving tracks since January 2026, will have integration with the metro. Section 3 (Águas Claras-Piatã): initial phase, will expand access to the city center and the waterfront. Two URBOS 3 model trains are already in Salvador. 17 more will arrive in 2026, totaling 40 trains with cutting-edge technology: free WiFi, cameras with artificial intelligence, digital panels and electric traction. SCHEDULE: 1st semester 2026: Technical tests (IN PROGRESS). 2nd semester 2026: Assisted operation WITHOUT FARE with 5 km available for the public to use. 2028: Complete conclusion. NUMBERS: 43.7 km in length, 50 stops, 100,000 passengers/day, R$ 5.4 billion invested (R$ 1.1 billion federal). José Carlos Santos, a 38-year-old street vendor: "We've always had difficulties with transportation. When you see a construction project underway, it gives you hope. It will make it easier to work, study, and get around." After 5 years of paying 10 times more for transportation, 5 years of promises, the Suburb finally sees the light. In 2026, for the first time, it's not a promise — it's real trains with a set date: the second half of the year. The Light Rail Transit (VLT) represents redemption of a historical debt to the Suburb. It's not just transportation — it's dignity, access, and quality of life. #VLT #Salvador #SuburbioDeSalvador #Bahia #PublicTransportation #Mobility #VLTSalvador #Infrastructure #MEGABAHIA #Brazil #PublicWork #ModernTrain #UrbanTransportation #Redemption #UrbanDevelopment

FIRST VLT CALÇADA-LOBATO TRIP WITH PASSENGERS, check it out

SUBWAY VS. LIGHT RAIL IN SALVADOR: The truth nobody tells you about both systems

Special Frontline - New Light Rail with ERACY LAFUENTE

God Says:"DON’T IGNORE THIS IMPORTANT LETTER I SENT YOU"/God Message Now/God Message

VLT Salvador 02/06/2026

Most Ridiculous Worker Mistakes Caught on Camera

Salvador's Light Rail Transit (VLT) - see where it will pass.

Never Buy a Water Pump Again! A 65-Year-Old Plumber Made His Own Water Pump Using PVC Pipes | Update

BODYBUILDERS Laughed at Him Again… Until Anatoly Was ATTACKED 😱💪🧹 | Gym Prank GONE Wild

Stuttgart 21 - verplant, verbaut, verschoben. Von falschen Kabeln und doppelten Signalen | SWR Doku

Why China Built The World’s Most Unprofitable Train Network

Who really made the Salvador light rail system happen?

🚨 INAUGUROU! Linha 6-Laranja finalmente abriu 🚝✨ Veja como ficou!

Where Are America's Trains?

VLT de Salvador - Operação Assistida (30/06/2026)

Is that all that's missing for the TRANSNORDESTINA railway?

Light Rail Transit (VLT) Works/Section 1/São João Island Direction

Unbelievable Smart Worker & Hilarious Fails | Construction Compilation #8 #adamrose #smartworkers

Dangerous Pakistani Factory Works FORGING the World’s Largest Industrial Gear | Full Process

