Trenching Utilities to the New Pole Barn — Start to Finish
In this video I tackle a major step in the new pole barn build — trenching utilities across the property up to the barn. The project includes digging long trench runs, assembling conduit, trenching inside the barn, and backfilling after snow and frozen ground slowed things down. 00:00 Picking up bedding sand to start the project 03:35 Starting the main trench run 11:00 Switching to the frost ripper 13:44 Assembling conduit for utilities 15:35 Trenching inside the pole barn 24:03 Flat tire stops progress 31:01 Initial sand backfill 43:18 Fixing the flat tire 46:06 Rough grading and cleanup 52:14 Resuming sand backfill after delays 1:02:27 Drone montage after snowfall 1:05:21 Lots of snow means more sand 1:09:45 Fighting traction on the hill 1:16:50 Finishing the main backfill 1:29:49 Project progress update 1:34:25 More sand and backfill inside the barn 1:44:19 Final trench section and gutter downspout fix 1:48:39 Final walkthrough and wrap up

This Old Shed Needed a New Home

46 Loads Later... the Road is Finally Taking Shape

We Went For One Abandoned Combine… Came Home With Two

Leveling a Massive Hilltop Pad for My NEW Pole Barn!

Bending Thumb Back With An 82,000 Lb Excavator

I Was JUST Going to Plant Grass...

Building A Forever Driveway In 4 Easy Steps…

The Pole Barn Was Useless… Until I Did This

A Truckload of Perfect Firewood Logs

Spray Foaming the New Pole Barn (What They Don't Show You)

Building a Driveway Over Muddy Ground

Cutting a Road into a Hillside with a Mini Excavator

Drug Mules Abandoned This In The Desert… It’s Mine Now

They Said I'm WRONG About Fabric Under Gravel - Watch What Actually Works

The Start of Our Million Bushel Bin Site Project!!

Clearing Land to Build a Pole Barn

300 Tons Of Rock, But Will It Be Enough For This New Road? Let’s ROCK IT…

Underwater Bulldozer | Will It Run?

Just Finished the First Job... Already Called Me Back for More Work

