阪急淡路駅 Vol.56|~繋がり連鎖で加速~ 崇禅寺/下新庄/柴島 高架化工事の全貌進捗 4K60p | Awaji Station Construction 2026-04
This massive project to elevate the Hankyu Kyoto and Senri Lines began in 2008. After repeated delays and the impact of the pandemic, construction has now spanned 18 years, missing its original goal of completion before the 2025 Osaka Expo. I initially started filming thinking it would be finished soon, but the project’s extension has led this series all the way to Vol. 56. 【Chapter List】 00:00 Section 1: Front of Kunijima Purification Plant to Sozenji Station Area 03:58 Section 2: ★Sozenji Station Area to Harakai Crossing ●PC Girder Installation 08:55 Section 3: Extended Truss Girders to Kyoto/Senri Line Junction 09:59 Section 4: ★Awaji Station (West) to Truss Girders over JR Lines ●Former Substation Elevated Extension 12:40 Section 4: ★JR Osaka Higashi Line to Shinkansen Overpass ●Elevated Structure Extension 14:51 Section 7: ★Shimoshinjo Station Area ●Platform Demolition / Track Removal / Crossing Relocation 17:33 Section 8: Kanzakigawa Bridge to Senri Line Construction Limit 19:27 Section 7: ★Shimoshinjo Station Area ●Platform Demolition / Track Removal / Crossing Relocation 20:32 Section 5: ★Shinkansen Overpass to Kyoto/Senri Line Truss Girders ●Elevated Extension Work 22:55 Section 5: ★Kyoto Line toward Kamishinjo to Construction Limit ●Gate No. 9 Foundation Work 26:19 Section 4: ★Truss Girders over JR Lines ●Former Substation Elevated Extension (East Side) 27:57 Section 3: Area around Hankyu Awaji Station (East) to Kyoto/Senri Line Junction 29:22 Section 6: Senri Line Truss Girders & Kyoto Line Truss Girders (East Side) 30:12 Section 6: Elevated Viaduct above Gakudo Crossing to Double-Deck Single-Track Structures 32:51 Section 6: ★Kunijima Station Area to Yodo River ●Under-Elevated Staircase Installation Historically, this area was plagued by traffic congestion and accidents at 17 railroad crossings. Upon completion, these 100-year-old crossings will disappear, making the city safer and quieter. The highlight is the viaduct’s height, reaching approximately 30 meters (the height of a 10-story building)—a first in Japan. Building such a "Giant Fortress" in a densely populated area without ever stopping train operations is a marvel of next-generation engineering that has silenced all skeptics. Witness the transformation of a century-old railway into a future-ready landmark.

Huge Double-Deck Junction! Awaji Station Construction Vol.57/Part.2 (May 2026) | Concrete Fortress

Observing the mysterious construction project to build a station above ground and eliminate level...

Difficult construction work for the maglev train is underway directly beneath Nagoya Station. Wil...
![[Elevated Railway] No. 1732 Demolition of the old platform is progressing! Scenes from the elevat...](https://i.ytimg.com/vi/KBAlyMdY8CI/hqdefault.jpg?sqp=-oaymwEjCNACELwBSFryq4qpAxUIARUAAAAAGAElAADIQj0AgKJDeAE=&rs=AOn4CLCiyChJAO5Ygv9a9FDlcdJWp0fiJg)
[Elevated Railway] No. 1732 Demolition of the old platform is progressing! Scenes from the elevat...

京急品川駅付近連続立体化事業 ~地平化工事の進捗状況~(※2026年5月5日時点)

I rode a special train that runs through a secret tunnel on the Osaka Metro.
![[ JRと意外な並走!] 華麗な阪急宝塚線/ 古墳を削った線路/ 感動の発車メロディー/ 華麗なタカラヅカ/ 変化を遂げた姿/ 高級住宅街と丘陵のカーブ/ 廃駅跡と廃駅跡/ 三複線ピッタリ並走](https://i.ytimg.com/vi/6jWggj73Lvc/hqdefault.jpg?sqp=-oaymwEjCNACELwBSFryq4qpAxUIARUAAAAAGAElAADIQj0AgKJDeAE=&rs=AOn4CLAnkjtnueR-bmSc8xFubceSIW1wZQ)
[ JRと意外な並走!] 華麗な阪急宝塚線/ 古墳を削った線路/ 感動の発車メロディー/ 華麗なタカラヅカ/ 変化を遂げた姿/ 高級住宅街と丘陵のカーブ/ 廃駅跡と廃駅跡/ 三複線ピッタリ並走

【不正発覚で造り直し確定】阪神なんば線の高架化工事と新しい淀川橋梁架け替え工事の現在の状況を見てきた

The Chaotic Railway Network of Osaka, Explained

【前面展望】阪急電鉄今津線 (宝塚→西宮北口→今津) 2026.2

It seems that the elevated railway construction is steadily progressing.
![[Unbelievable] What's the reason behind the "restart" of the massive construction project on Osak...](https://i.ytimg.com/vi/_tZwnFIJ01c/hqdefault.jpg?sqp=-oaymwEjCNACELwBSFryq4qpAxUIARUAAAAAGAElAADIQj0AgKJDeAE=&rs=AOn4CLBJEbfqzxXmVE5eQExdfNEv3rBd2g)
[Unbelievable] What's the reason behind the "restart" of the massive construction project on Osak...

Night Bridge Girder Installation at Sozenji Omiyabashi | Hankyu Awaji Station SE Vol.27 (4K)

相鉄線 廃駅をゆく

Railway Technical Research Institute: Leading the Way - Japan Railway Journal
![[7.1km] One of Japan's largest elevated railway projects: Increased costs and extended constructi...](https://i.ytimg.com/vi/50bt4kgUVso/hqdefault.jpg?sqp=-oaymwEjCNACELwBSFryq4qpAxUIARUAAAAAGAElAADIQj0AgKJDeAE=&rs=AOn4CLBnvTPUhBI1AvMBEnfprIIV7Ed2Lw)
[7.1km] One of Japan's largest elevated railway projects: Increased costs and extended constructi...

【爆音】阪急3300系が朝の準特急で爆走!桂→大阪梅田 (4K HDR 60fps)【引退間近】

Riding China’s Most Unique Slow Train Deep Inside Its Poorest Area

【#阪急電車 】十三駅の車両点検で宝塚線、神戸線が遅延!京都線は雨でプチ遅延な大阪梅田駅の夜 2026年5月27日

