Najbardziej ryzykowna przebudowa… Czy osada to udźwignie? | Timberborn 1.0

It's finally time for the long-postponed regulation of the three underground water sources beneath Leaky Faucet. This isn't just another construction project — it's a potential threat to the entire settlement. Simply starting this project is already a risk, and once it begins, it has to be completed quickly and without mistakes. The dangers? A Badtide could arrive sooner than expected. What if the water spills out? What if a river of badwater floods the beavers? Honestly, the biggest threat may be the amount of time required for such a massive reconstruction effort. On one hand, I don't fully understand how the water sources work, and I'm about to dig very deep. On the other hand, I'll be dismantling part of a reservoir and will need to rebuild it fast enough to avoid disaster. Not to mention that the badwater drainage canal has to be built in an area where no beaver has ever set foot before. There are a lot of question marks, an enormous demand for time, and an even greater demand for materials. In its own way, this reconstruction is a great stress test for the settlement. Will Leaky Faucet and its Iron Teeth beavers be able to pull it off? Chapters: 00:00:00 Intro 00:00:33 Introduction and the plan 00:09:19 Demolishing the safety valves (timelapse) 00:12:18 Demolishing the farm cave scaffolding 00:15:27 Shower fail 😄 00:18:34 Shaping the reconstruction plan (timelapse) 00:21:40 Water sources are indestructible (important) 00:25:57 Seal the sources — time is running out! (timelapse) 00:28:30 Managed to enclose the source just before temperate weather 00:33:07 Clearing the canal (timelapse) 00:36:22 Planks and logs — commentary 00:41:13 Outlet structure and river connection (timelapse) 00:47:08 Connecting the badwater river to the drainage canal 00:56:05 Project finalization (timelapse) 00:58:46 Moment of Truth