四川 大渡河沙坪一级水电站最后一台机组并网发电 大渡河水电基地新增装机突破200万千瓦 两河口抽蓄电站进入全面建设关键期

The Dadu River Basin is one of the three largest river basins in Sichuan Province in terms of hydropower resources, with a planned hydropower development capacity exceeding 27 million kilowatts, making it the fifth largest hydropower base in my country. Today (the 30th), with the successful grid connection of the last generating unit of the Shaping First-Level Hydropower Station on the Dadu River, the Dadu River hydropower base has added over 2 million kilowatts of clean energy capacity, becoming one of the first river basins in China to achieve centralized and large-scale hydropower operation during the 15th Five-Year Plan period. To date, Sichuan Province's total installed capacity of clean energy has exceeded 130 million kilowatts, with hydropower accounting for nearly 80%. Recently, at the Yalong River Basin's integrated hydro-wind-solar base in Sichuan, the Lianghekou Hybrid Pumped Storage Power Station, the world's largest hybrid pumped storage project, has entered a critical phase of comprehensive construction. Lianghekou Pumped Storage Power Station Enters Critical Phase of Comprehensive Construction Diversion Channel Construction in Full Swing to Ensure Safe Flood Season for the Yalong River The Yagen First-Level Hydropower Station, located in Yajiang County, is an important component of the Lianghekou Hybrid Pumped Storage Power Station. Aerial footage shows that the cofferdam on the main channel of the Yalong River completely separates the river water from the construction work area, with formwork hoisting and rebar binding operations underway inside the cofferdam. Currently, the Yalong River water flows downstream through a diversion tunnel inside the mountain. However, with the flood season approaching, the diversion tunnel's flow capacity is insufficient to meet flood control demands. Therefore, the power station is constructing a diversion channel, currently in its final pouring stage, and is expected to be operational in ten days. At that time, the cofferdam will be dismantled, and the Yalong River water will flow smoothly downstream through the diversion channel. The arrival of the flood season also poses a severe challenge to the mountains on both banks. On the cliffs on both sides of the river, construction workers are working like "spider-men," simultaneously laying protective netting and reinforcing the slope rock. Dynamic Water Regulation and Hybrid Pumped Storage to Address Energy Storage Shortcomings The Yalong River basin is currently constructing the world's largest integrated hydro-wind-solar clean energy base, with a planned total installed capacity of 78 million kilowatts. The Lianghekou Hydropower Station, the Kela Photovoltaic Power Station, and the Suorong Photovoltaic Power Station together form the world's largest "hydro-solar complementary" project. "Hydro-solar complementary" refers to using the Lianghekou Hydropower Station to regulate the instability of photovoltaic power generation, but this method cannot store excess electricity. The construction of the Yagen First-Level Hydropower Station, however, impounds the water released from the Lianghekou Hydropower Station, forming a reservoir with a capacity of approximately 41 million cubic meters, acting as a giant energy conversion station and energy storage device. During the day, when photovoltaic power generation is abundant, reversible units pump water from the downstream reservoir of Lianghekou back to the upstream reservoir for storage, converting excess electricity into hydropower. At night, during peak electricity demand and when photovoltaic power generation is insufficient, water is released downstream, generating electricity both at the Lianghekou Hydropower Station and at the downstream Yagen First-Level Hydropower Station. After completion, the project will be able to transform approximately 7 million kilowatts of fluctuating wind and solar power generation into a stable, high-quality power source. This allows clean energy to complement each other, ensuring that green electricity can be received and transmitted effectively. A Two-Way Collaboration of Clean Energy and Artificial Intelligence On the Yalong River, a group of "special employees" are changing traditional work methods, making engineering construction safer and more efficient, and extending their influence to the operation and maintenance management of the entire integrated hydropower, wind power, and solar power base. Inside the tunnel hundreds of meters underground, previously 15 workers were needed to work close to the high-risk work area. Now, only one worker needs to stand in a safe area and click a button on a computer to control an intelligent rock drilling rig dozens of meters away, performing fully automated drilling operations. The geological structure of the high-altitude tunnel is complex and changeable. Just the day before the reporter's visit, a minor rock burst occurred at the work face. Thanks to the use of the "T...

暴跌70%! 传奇投资者紧急警告: 我正在卖出, 崩盘已经开始了! AI是史上最大泡沫! 普通人必须马上做这三件事保住财富【艾财说213】
▶︎

暴跌70%! 传奇投资者紧急警告: 我正在卖出, 崩盘已经开始了! AI是史上最大泡沫! 普通人必须马上做这三件事保住财富【艾财说213】

平陆运河工程创下多个“世界第一” 堪称通江达海的“水上高速” | CCTV「东方时空」
▶︎

平陆运河工程创下多个“世界第一” 堪称通江达海的“水上高速” | CCTV「东方时空」

福斯電視為抹黑中國道歉了 美軍少校公開喊彈劾川普了【#新聞大白話】20260704-6│#謝寒冰 #栗正傑 #吳崇涵
▶︎

福斯電視為抹黑中國道歉了 美軍少校公開喊彈劾川普了【#新聞大白話】20260704-6│#謝寒冰 #栗正傑 #吳崇涵

World's first wind-powered underwater data center in commercial use
▶︎

World's first wind-powered underwater data center in commercial use

当年骂中国车是“垃圾”的外国媒体,如今...
▶︎

当年骂中国车是“垃圾”的外国媒体,如今...

Xi'an-Shiyan High-Speed Railway Opens Today; Manchuan Pass Enters the High-Speed Rail Era
▶︎

Xi'an-Shiyan High-Speed Railway Opens Today; Manchuan Pass Enters the High-Speed Rail Era

郭正亮:中國距離對日「真絕情」只差一步!准軍事介入「日本兩年內無解」!高市恐誤損美在華利益,中美高科技可聯手!@BNETVNZ
▶︎

郭正亮:中國距離對日「真絕情」只差一步!准軍事介入「日本兩年內無解」!高市恐誤損美在華利益,中美高科技可聯手!@BNETVNZ

工廠製糖全過程,全球年產1.75億噸!看甜菜如何經過66把刀切絲、65英尺浸糖塔、石灰淨化和12.5小時結晶,變成雪白砂糖!|超級後廚 食品工廠
▶︎

工廠製糖全過程,全球年產1.75億噸!看甜菜如何經過66把刀切絲、65英尺浸糖塔、石灰淨化和12.5小時結晶,變成雪白砂糖!|超級後廚 食品工廠

The city China built in the center of its biggest desert, with 20000 people and found in 2015
▶︎

The city China built in the center of its biggest desert, with 20000 people and found in 2015

平陆通江海!打开西部出海之门,运河将使整个西南地区获得出海黄金水道
▶︎

平陆通江海!打开西部出海之门,运河将使整个西南地区获得出海黄金水道

Japanese Bonds Collapse + Yen Plummets
▶︎

Japanese Bonds Collapse + Yen Plummets

屏東再也不會缺水!? 大潮州人工湖:洪水資源化 Da Chao Zhou Artificial Lake: Beneficial Water Reuse from Stormwater
▶︎

屏東再也不會缺水!? 大潮州人工湖:洪水資源化 Da Chao Zhou Artificial Lake: Beneficial Water Reuse from Stormwater

【小岛浪吹】从阿嫲的情书到印加坡:一个华人多数国家的身份焦虑
▶︎

【小岛浪吹】从阿嫲的情书到印加坡:一个华人多数国家的身份焦虑

中国最难水电工程开工!深入分析雅鲁藏布江下游水电工程怎么建
▶︎

中国最难水电工程开工!深入分析雅鲁藏布江下游水电工程怎么建

准軍事介入!中國對日「再上強度」!郭正亮:你日本敢開炮嗎?!稀土禁令「又准又狠」,日企慘局最晚八月見真章!@BNETVNZ
▶︎

准軍事介入!中國對日「再上強度」!郭正亮:你日本敢開炮嗎?!稀土禁令「又准又狠」,日企慘局最晚八月見真章!@BNETVNZ

下南洋到印尼,十个去九个死,一个不见了!苏北华人历史文化馆
▶︎

下南洋到印尼,十个去九个死,一个不见了!苏北华人历史文化馆

2026.06.30 不再克制!北京突然換打法!兩大戰線同時升級!【亮哥專訪|郭正亮】三妹说亮话  @BNETVNZ @郭正亮頻道
▶︎

2026.06.30 不再克制!北京突然換打法!兩大戰線同時升級!【亮哥專訪|郭正亮】三妹说亮话 @BNETVNZ @郭正亮頻道

太激动了,一口气看完平陆运河全段,感觉广西的春天来了
▶︎

太激动了,一口气看完平陆运河全段,感觉广西的春天来了

從行業笑柄到救命神器!A380史詩級翻盤:被罵十年錯判,卻在2026年拯救全球航空
▶︎

從行業笑柄到救命神器!A380史詩級翻盤:被罵十年錯判,卻在2026年拯救全球航空

Inside China's Most CONTROVERSIAL Region… It Surprised Me 🇨🇳
▶︎

Inside China's Most CONTROVERSIAL Region… It Surprised Me 🇨🇳