[FULL ROUTE, 4K] O-Train - Line 2 “Trillium” Southbound (Stadler Rail FLIRT C12)
C12 is part of a seven diesel-electric multiple unit (DEMU) order that was ordered as part of the Stage 2 South extension, being ordered as fleet expansion units for the reopening of Line 2 "Trillium" that finally happened on January 6th, 2025. They can be found exclusively on O-Train's Line 2 "Trillium." This ride was recorded in 4K on April 21st, 2025 on an iPhone 15 Pro. ( VEHICLE SPECIFICATIONS ) Model: Stadler Rail FLIRT Years of Manufacture: 2021 Operator: OC Transpo Engine: 4x Deutz TCD 16.0 (700hp per engine) Transmission: 4x TSA AC traction motors (with ABB IGBT-VVVF controllers) ( FULL PLAYLIST ) • Ottawa-Carleton Regional Transit Commission ( SOCIAL MEDIA ) All official MiRide social media outlets are found at the bottom of the MiRide Carrd. Carrd: https://miride.carrd.co/ MiRide is a Greeism Subdivision, dedicated to Canadian transit content. #Line2 #Trillium #OCTranspo

Thoughts on the launch of Line Two trains

Ottawa O-Train ride on the Trillium Line (Line 2) with the new extension - May of 2025

Why Ottawa Built Canada's Weirdest Train System (It...Kinda Works?)

The World's Oldest S-Bahn...is in Glasgow? | Glasgow Regional Rail Explained (by an American)

Line 5 Light Rail Transit Ride

The Massive Transit Fix Chicago Desperately Needs

O-Train Line 2 - Limebank to Bayview (Northbound Trip in Fall 2025)

112 Dead… And No One Knows Why

⁴ᴷ⁶⁰ Vancouver SkyTrain Front Window View - Expo Line to King George

Transpennine Express Class 802211 journey Newton-Le-Willows - Liverpool Lime Street 🚆 | 28/05/2026

O-Train Line 2 - Bayview to Limebank (Southbound Trip in Fall 2025)

My First Ride on the REM Anse-a-l'Orme Branch

The Biggest Transit Expansion People Aren't Talking About | Ottawa O-Train Stage 2

GOTrain Sunset Ride

Opening day of the long awaited line 5 Eglinton crosstown lrt from mount Dennis to Kennedy

REM Metro trains in Montreal, Canada 🇨🇦 | 2025

TT Ride-Along – OC Transpo’O-Train Line 2, Bayview-Limebank Preview Ride on Stadler FLIRT(Corrected)

Newton Heath TMD to Manchester Piccadilly via Ashburys Limit of Shunt

Evolution of the Ottawa Transitway and Light Rail | 1983 - 2027

