[FULL ROUTE, 4K] O-Train - Line 2 “Trillium” Southbound (Stadler Rail FLIRT C12)

C12 is part of a seven diesel-electric multiple unit (DEMU) order that was ordered as part of the Stage 2 South extension, being ordered as fleet expansion units for the reopening of Line 2 "Trillium" that finally happened on January 6th, 2025. They can be found exclusively on O-Train's Line 2 "Trillium." This ride was recorded in 4K on April 21st, 2025 on an iPhone 15 Pro. ( VEHICLE SPECIFICATIONS ) Model: Stadler Rail FLIRT Years of Manufacture: 2021 Operator: OC Transpo Engine: 4x Deutz TCD 16.0 (700hp per engine) Transmission: 4x TSA AC traction motors (with ABB IGBT-VVVF controllers) ( FULL PLAYLIST )    • Ottawa-Carleton Regional Transit Commission   ( SOCIAL MEDIA ) All official MiRide social media outlets are found at the bottom of the MiRide Carrd. Carrd: https://miride.carrd.co/ MiRide is a Greeism Subdivision, dedicated to Canadian transit content. #Line2 #Trillium #OCTranspo