Obras de la Línea 6 de metro: comienza la segunda fase con nuevos cortes y reapertura
This Saturday, service reopens on Line 6 of the Madrid Metro between the Moncloa and Méndez Álvaro stations, a section that has been closed since the end of May. At the same time, and also this Saturday, the other section between Moncloa and Legazpi is being closed for work that will continue until December 31. These works are adapting the stations and tracks of the gray line to the new driverless trains. ▶️ More videos at http://www.telemadrid.es ▶️ Subscribe: http://telemd.es/m3mfh

▶︎
🚇 The CALE of the 1st SECTION of L11 is a Milestone in the Works on the Madrid Metro

▶︎
Frankreich – England Highlights | Spiel um Platz 3, FIFA WM 2026 | sportstudio

▶︎
Madrid Metro Line 6 🚇 28 Facts You Might Not Know

▶︎
🚧 ATOCHA STATION CONSTRUCTION: WILL THEY FINALLY OPEN THE HISTORIC MARQUEE? | JULY 16, 2026 🚧

▶︎
Madrid's first driverless metro train arrives

▶︎
Green light for the Metro Line 11 extension to Valdebebas

▶︎
🚧 SUMMER FULL of WORKS at ATOCHA STATION 🚧 Commuter Rail Track Upgrades / Sol Tunnel / Madrid

▶︎
The 5 alternatives for extending the Metro to Madrid Nuevo Norte

▶︎
Tren de la Selección Española | Trenes por la línea 4 de Metro de Madrid

▶︎
Los cortes en la línea 6 de Metro, desde finales de mayo

▶︎
Así será la nueva Línea 6 de Metro automatizada sin conductores

▶︎
Madrid Metro's driverless trains undergo testing

▶︎
🔴This is how the renovation of the C5 commuter rail line between Móstoles El Soto and Humanes look

▶︎
What it's like to travel INSIDE a driverless METRO on the L6

▶︎
Todo lo que está mal con Metro Ligero Oeste.

▶︎
Madrid Metro's new Line 6: Transparent partitions, driverless trains...

▶︎
✅ EXTENSIONS Lines 3 5 10 and 11 MADRID METRO ✅ METROSUR / Barajas / Atocha / Chamartín

▶︎
I VISITED ALL THE METRO STATIONS IN MADRID 🇪🇸🥵 | How did I do it?

▶︎
Madrid Metro Survival Guide (Watch Before You Go!)

▶︎
