S2 E4 The Rebuild Begins at Bexhill West Model Railway

In this video, I outline the new baseboard arrangements which have been designed with the change in gauge to P4 in mind. I run through the layout of the first board and show how the elements from the previous arrangement will be incorporated. Thanks for watching, James