First train in two weeks - clearing the line
For one reason and another there has been no traffic at all for the last two weeks (not since last year in fact!) so the line has become covered in plenty of fallen leaves. The mower wagon and diesel electric locomotive were used to clear the line for regular service to resume. It is summer at the moment, and the trees drop a lot more leaves when they become drought stressed. The Eltham South Electric Tramway is a 1:24 scale, 45mm gauge tramway in Melbourne, Australia.

▶︎
Springtime weed slashing train - operation resumes after winter

▶︎
Collecting weeds for the chickens

▶︎
GWR trains at Ruddington gauge 1 track 14/06/26 with a Castle, a King, a Bulldog, a Prairie & a 28xx

▶︎
RhB LGB Gartenbahn von Peter Kamerafahrt Berninabahn

▶︎
Storm Damage

▶︎
Reger Verkehr auf der Selketalbahn 1:22,5

▶︎
A Day in the Life of a Model Engineer

▶︎
Die kleine Dampflok der Stumpfwaldbahn an Pfingsten 2026

▶︎
Cab ride to Mt Pleasant

▶︎
new garden train layout and rc boat pond 10

▶︎
First train in weeks - clearing the line by steam power

▶︎
steam tomato train

▶︎
Eltham South Electric Tramway - Full Cab Ride

▶︎
How to Build a Railway – A New Turning Loop at Peter's Railway

▶︎
Winter auf der FBG Januar 2019

▶︎
Rainy day run to Succulent Valley

▶︎
The Blue Garden Railway - 100,000 subscribers Special 🙀

▶︎
A Look Inside the Amazing Train Mountain Track Shop

▶︎
Winter weed slashing train

▶︎
