日本を襲った大災害に立ち向かった男たち【災害復旧工事・全記録】
※ During block installation, a supervisor is assigned to ensure the surrounding soil does not collapse. Thank you for watching the video. MK Project is a channel specializing in civil engineering, operated by Miura Kaihatsu. “We want more people to know about civil engineering work.” With that thought in mind, we began posting videos on YouTube. We are a small company, but we continue to grow by applying the skills we’ve developed over more than 30 years. Though we may still have areas to improve, we will continue taking on challenges to share the depth and joy of civil engineering. 00:00 Project Overview 01:55 Temporary Road Construction 03:59 Installation of Drainage Pipes 07:12 Excavation Work 08:09 Securing Drainage Path 10:51 End Block Installation 12:22 Base Gravel Laying 13:09 Foundation Block Installation 16:51 Stone Stacking 19:13 Installation of Retaining Blocks 22:33 Backfilling with Gravel and Concrete 24:07 Installation of Top-Level Blocks 25:21 Formwork Assembly 26:00 Finishing Top Concrete Surface 28:13 Earth Retaining Structure Creation 28:58 Vegetation Protection and Slope Shaping 30:36 Restoration of Drainage Pipe 31:46 Completion of Restoration Work

Japan's world-class civil engineering technology! 4 construction projects

girl bought this abandoned house overgrown for $6000 to invest in a farm | the ending was amazing

Top 6 Mega Factories High Level Mass Production Process

3 months of tough work: Japanese craftsmen revived a postwar drainage channel

After Retirement, a Female Soldier Buys a Forgotten House and Creates a Peaceful Dream Life Alone

I Spent Six Months Building a Road Alone in the Mountains

【大雨・氾濫・住宅浸水】現場に向かう林業家に密着〜8月4日石川県白山市鶴来〜 なかの林業

Ingenious Girl Turns an Old Truck Into an Incredible Mobile Home | Full DIY Build

Huge Rocks Crushing Process. Super Satisfying Stone Crushing Process by Jaw Crusher #rockcrusher

Restoring farmland after heavy rain / Block installation, soil improvement, vegetation protection

How Japan Built A Canal In Just 2 Days Using Fabric Formwork: Engineering At Its Peak

Recovery Process from Road Collapse Due to Rain【Disaster Recovery Project Part 1-6 Compilation】

Build a sturdy bridge over the small stream.

Amazing Plastic Mixing Machine Manufacturing Process | From Steel Sheets to Finished Machine

VN24 - MB UNIMOG Pulls a 40-ton Semi-Truck Out of a Ditch on the Interstate A44
![[Connecting to the Next 100 Years] The Complete Process of Repairing a Decayed Shrine Roof](https://i.ytimg.com/vi/CHaud_U-7ww/hqdefault.jpg?sqp=-oaymwEjCNACELwBSFryq4qpAxUIARUAAAAAGAElAADIQj0AgKJDeAE=&rs=AOn4CLBWPRjfpSq6MIYn4rmhjyu0uvB7Ng)
[Connecting to the Next 100 Years] The Complete Process of Repairing a Decayed Shrine Roof

Process of Constructing a Concrete Modular House in Just 2 Weeks. PC(Precast Concrete) Factory.

KA3000R HLジブ組立て

Greatest Land Filling Ever Meet In The Earth- Bulldozer Moving Big Rocks Into Water Vs Dump Trucks

