भारत की पहली बुलेट ट्रेन का ट्रायल सूरत से बिलिमोरा के बीच में 2026 में होगा @NewsStation
Join this channel to get access to perks: / @newsstation Railway Minister Ashwini Vaishnaw visited the state-of-the-art track slab manufacturing facility at Kim, near Surat, integral to India’s ambitious Bullet Train project. This facility, one of the largest in the world, produces high-quality track slabs using advanced Japanese Shinkansen technology, essential for the stability and performance of the Mumbai-Ahmedabad High-Speed Rail (MAHSR) corridor. Minister Vaishnaw highlighted the critical role of the track slabs, which will directly support the rails without separate sleepers, ensuring precise alignment and durability. The factory spans 19 acres, with 7 acres dedicated to production, and is capable of manufacturing 120 slabs daily. Each pre-cast slab weighs 3.9 tons and measures 2.2 meters wide by 4.9 meters long. The factory will produce 96,000 J-slabs for the 237 km track in Gujarat and Dadra Nagar Haveli. As of now, 9,775 slabs have been cast, and production is ongoing. This facility is a crucial step in the realization of India’s first Bullet Train project, ensuring the timely and efficient delivery of track components. #BulletTrainIndia #HighSpeedRail #ShinkansenTechnology #MadeInIndia

How Toilet Bowls Are Made | Amazing Toilet Bowl Manufacturing Process in Pakistan

NHSRCL | Bullet Train Track System

Advanced ‘In-Sleeper Point Machine’ Technology Set to Transform Railway Safety and Efficiency

Surat Bullet Train Station | 2026 Update | सूरत, गुजरात | #rslive | #4k

Why India Wants To Run Only 1 Train?? | upGrad

Mumbai–Amdavad Bullet Train Project Update | May 2026

ghost metro of india: रोज 8 लाख खर्च, सवारी 100 से भी कम | ground report

Incredible Process of Making Toilet Bowls in Factory | Mass Production of Toilet Bowls

Decode : 15 अगस्त 2027 से भारत में दौड़ेगी 'Bullet Train'! | Sudhir Chaudhary | Route | Speed | News

Imported Bajaj 6 Seater Rickshaw From India || Assembling for Afghan Roads ||

NHSRCL | Construction of elevated section in Maharashtra | Bullet Train Project (English)

mumbai ahmedabad bullet train undersea tunnel | भारत की पहली 7 किलोमीटर लंबी समुद्री सुरंग |

45 Expensive Agricultural Machines Working at Another Level | Most Powerful Farm Equipment ▶ 1

भारत बन गया नंबर वन देश 😲 भारत से दुबई दौड़ेगी वंदे भारत

Mumbai Bullet train station | जमीन से 200 फीट नीचे | BKC bullet train station | #rslive | #4k | 2026

How India Turns Million Tons of Garbage Into a Multi Billion Dollar Industry

Dangerous Pakistani Factory Works FORGING the World’s Largest Industrial Gear | Full Process

NHSRCL | Bullet Train Track System

Germany जितना Rail tracks India ने 10 साल में बना दिया 🔥 Top 10 Innovative technologies in Railways

