Massive wind turbine blade lifted over houses, trees and mountain-sides
A 57.5 metre long wind turbine blade is transported through the Jura Mountains of Switzerland. It is raised over multiple buildings, mountain-sides, street furniture and trees on its complicated journey to the Sur Gratis Windpark, in the Canton of Vaud. Emil Egger have been transporting wind turbine components manufactured by Enercon in Portugal. The journey has consisted of travelling by ship, train and road. The most unusual of which is the movement you see here on a specialist Blade Lifting device, mounted on a Self-Propelled Modular Transporter. This is one of several blades being installed on a total of six wind turbines. Recorded: 4th June 2026 --------------------------------------------------- Join this channel to show support: / @cobraemergency Outroduction Music: Watch it Glow - Silent Partner • Watch it Glow – Silent Partner (No Copyrig... --------------------------------------------------- Ⓒ CobraEmergency

Windräder fertigen | Wie geht das? | NDR

The race to build the perfect wind turbine

Windrad-Bau: Unterwegs mit Schwertransport und 1.000-Tonnen-Kran

Operation Windrad-Bau: So wird eine Windkraftanlage gebaut | Die Nordreportage | NDR Doku

Inside the factory where three-phase motors powering society are made

Four planes fly President Trump's motorcade to Europe as police activity ramps up for G7 summit

Super sized transport takes over town centre as police escort 356 tonne generator

Extreme Logging Trucks 12 Challenger Preload 1994 Big Cedar Load

How These Machines Actually Work 20 Minute Industrial Compilation ▶ 2

Trimming snowmobile trails fall 2025

TIMELAPSE - Harvesting a Giant Beehive Under an Ancient Tree and Bringing It to Sell at the Market

SOUNDVIDEO - CLAAS XERION 12.650 & US ARMY OSHKOSH! | 100ft Morris Air Drill Aussast 26 in Kanada 🇨🇦

Why This Japanese Speaker Maker Spent 50 Years Perfecting Jazz Sound

Construction Tips & Hacks That Work Extremely Well

BUSY BEAUMONT HILL + New Anti-Theft Device on Freight Trains?

Entstehung des Windparks Ahrensfeld Wittefeld in Bramsche

Abandoned Dozer In Pond | Will It Start?

Inside a Wind Turbine: How It Really Works

Inside Liebherr: Creating the Largest Mobile Cranes in the World | FD Engineering

