An update of Stoke on Trent station lifts

Good to see all the indicators have been fixed and both lifts are operational as normal following the Platform 2 lifts being modernized with Hydroware last year. The P1 lift is traction and both did use Mavercourt controllers I do not know if P1s had a controller upgrade at the time while P2 was being upgraded but it runs the same as previously. Filmed on Pixel 6A 4K 30 Ultrawide 29/2/24