CP Rail Winchester Sub Ontario August 2020 CMQ Train with welded rail lifted from the north track.
The CP Rail is lifting the North track on the Winchester Sub. Between Smiths Falls Ontario & Quebec. The decreased traffic no longer warrants a double track mainline. CP Rail is also installing CTC signaling and long sidings. I caught a train lead by CMQ units hauling rail recently lifted from the Winchester Sub.

▶︎
Unbelievable Train Moments Caught on Camera

▶︎
Abschied der Legende! Letzte Fahrten des IC Allgäu (BR 218) | IC 2012 & IC 2013 | Mainz – Oberstdorf

▶︎
Idiots with Fast Trucks: Heavy Equipment Fails | Extreme Oversized Truck Transport #25

▶︎
Moments You Must See To Believe | Incredible Moments #10

▶︎
When Animals Surprise Photographers in the Sweetest Way! 😍

▶︎
Listen, what's coming in from outside – it'll probably be a nice little train: Ingolstadt Central...

▶︎
Eastern Ontario Trains. CP Rail, VIA Rail and CN Rail. May 2023

▶︎
The Thunder of Twin EMD 567 Engines! Behind the Scenes as Two Nohab Locomotives Prepare for Action!

▶︎
Total Idiots at Work Caught on Camera | Best of 2024

▶︎
Impossible Places: World's Most Dangerous Railways on Earth You Can't Believe They Exist

▶︎
If These Train Moments Weren’t Filmed, Nobody Would Believe Them

▶︎
Most Ridiculous Worker Mistakes Caught on Camera

▶︎
Failure to electrify Britain’s railway is costing the UK £Billions! | Ep 144

▶︎
Interesting Railway Engineering: The "Auflaufkurve" (Run-on Curve)

▶︎
CN Rail 589 to Arnprior. Ottawa's last remaining freight train. Scenes along the Picturesque branch.

▶︎
Overloaded Sand Ship Fails While Fighting Upstream At The Dam Gate

▶︎
Unbelievable Smart Worker & Hilarious Fails | Construction Compilation #72

▶︎
Unbelievable Train Moments Caught on Camera

▶︎
Winter on Donner Pass

▶︎
