HOW IT WORKS? Horizontal directional drilling. Pilot well drilling. First day.

This video about First stage - Pilot well drilling during the construction works of water pipe using Horizontal directional drilling method. The water pipe is about 100 meters (328 feets) long, laid at a depth of 4 meters (13 feets). Horizontal directional drilling (HDD) is a safe method of installing an underground pipeline. The Second stage of HDD will be in the next video. If you like this video please like and subscribe. #arendadrom #hdd #horizontaldirectionaldrilling #constructionwaterpipe #nodig #drillingwaterpipe #pilotwelldrilling #гнб #проколподдорогой #undergroundpipeline www.arendadrom.com   / .  .   / arendadrom​​​​   Music: Josh Pan - Cat Shat in the box Bobby Richards - Tak