Aerial flyover - Takitimu North Link, April 2026
View the latest flight over the Takitimu North Link Stage 1 project site filmed in April 2026. We start at SH2/Fifteenth Ave in Tauranga and head westward to Te Puna, with commentary provided by Jessa, a drainage engineer on the project. This project is a Road of National Significance supporting economic growth and productivity in the western Bay of Plenty, by providing a reliable, resilient and safe expressway connection between Tauranga and Te Puna.

▶︎
A fly-over of Ōtaki to north of Levin July 2026

▶︎
SH1 Wellington Improvements

▶︎
Helios Is AMD’s First AI System To Rival Nvidia Vera Rubin — We Got An Exclusive, First Look

▶︎
Te Ahu a Turanga: Manawatū Tararua Highway - 2025 Final Flyover

▶︎
Ōtaki to north of Levin: Te Pae o Tararua flyover - May 2026

▶︎
SH76 Brougham Street Upgrade Reaches Major Milestone in Christchurch

▶︎
‘EMBARRASSING for us’: MS NOW reacts to Trump’s behavior at World Cup final | COMPILATION

▶︎
The €7BN Mega-Canal That Will Reshape Europe

▶︎
Why Is Auckland So Unique?

▶︎
The Pyramids Were Easy To Build, Actually

▶︎
New Zealand's BIGGEST Highway Rebuild in History

▶︎
How Wealthy Are You Compared to Most New Zealanders?

▶︎
How the Netherlands Built the Impossible Highway Under Water

▶︎
India (Finally) Finished its Impossible Bridge

▶︎
China’s Sodium Battery Breakthrough Just Made Lithium OBSOLETE

▶︎
Snowy Hydro 2.0 In Depth Walkthrough

▶︎
10 "Temporary" Structures That NEVER Left

▶︎
Norway’s $1.6B Subsea Road Tunnel Is a Brutal Build. Undersea Tunnel Construction Documentary

▶︎
Rehydrating Thirsty Land – Regenerative Rangelands

▶︎
