Canning Stock Route Well 26 Restoration 1983 - Tiwa - the Desert Well
Reconstruction of Well 26 on the Canning Stock Route in 1983 on the 75th Anniversary of the construction of the 1600km route by Alfred Canning. Expedition led by David Hewitt with Harry Gough, Mike Bamford, Ian Johnson and many other volunteers including the Australian Army. Film produced by WAIT / Neville Ballard.

▶︎
This Engine Breaks ALL the Rules

▶︎
Will it START? OLD Bulldozer ABANDONED in the Bush for YEARS!

▶︎
The Canning Stock Route - Epic cinematic feature length film

▶︎
Finding Outback Water

▶︎
This man built a massive log cabin in the forest with his own hands in just one year! @bjornbrenton

▶︎
Is Russia Actually Losing?

▶︎
Why the Atlantic Wall Failed So Quickly

▶︎
Why 80% of Soviet Soldiers Who Entered The Karelian Forest in 1939 Never Came Home

▶︎
Fixing ROTEL's Vintage Tape Chewer - The RD-500

▶︎
Lifetime-Abused 1961 Omega Watch Restoration – Welding Heavy Case Damage - Automatic Seamaster

▶︎
YOU WON'T BELIEVE how this DOG looks after shaving all these dreadlocks

▶︎
I Restored a 100 Year Old Pot - Then Cooked the Best Stew of My Life!

▶︎
How Oak Logs Turn into Whiskey Barrels

▶︎
Canning Stock Route by 4WD CSR 2019 | Part 5 | Kunawarritji | Thringe Rock | Slate Ranges

▶︎
1950's Live Steam Machine 'Wilesco' - Restoration

▶︎
Only Pakistani Mechanics Can Repair This Giant Caterpillar Loader Tire

▶︎
Incredible Relics Found in German Dugouts - Metal Detecting WWII Battlegrounds

▶︎
The Last Cape Horners

▶︎
Rolex Said: Impossible | Restoration of a Vintage GMT-Master - Directors Cut

▶︎
