MODEC FPSO PSVM - Animation
In 2008 MODEC was awarded a Frame Agreement from BP for the supply of an FPSO under an EPCI contract for the PSVM (Plutão, Saturno, Vênus and Marte) Development in Block 31 offshore Angola. The FPSO has a production capacity of 157,000 barrels per day and first oil from the development was February 2013.

▶︎
What is an FPSO? FPSO Fundamentals with SBM Offshore

▶︎
FPSO Topsides Design Optimization Reducing CAPEX Through Lighter Topsides Modules

▶︎
Girassol FPSO Angola Live Walk Around Part 1 #angola #offshorelife #offshore #total

▶︎
PSVM Antimation

▶︎
MODEC Corporate Video 2015 - English

▶︎
FPSO Guanabara MV31 – From China to Mero field and First Oil

▶︎
Internal Turret POVO Vietnam_Animation

▶︎
MODEC iTLP2-FOWT ~Full version~

▶︎
OOGTK | FPSO Pioneiro de Libra Vessel 3D Animation

▶︎
What is an FPSO? How an FPSO Operates

▶︎
Watch This 300,000-Ton Ship Disappear | The Final Moments of a Stellar Banner long version HD

▶︎
Hanwha Ocean LNG FPSO(Floating Production Storage Offloading)

▶︎
OFFSHORE PLATFORM JACKET INSTALLATION

▶︎
First oil for FPSO Cidade de Saquarema

▶︎
FPSO Hook-Up

▶︎
How Do Oil Rigs Work? Drilling, Casing, Mud & Blowout Prevention in 3D

▶︎
Powering P-63 FPSO | Wärtsilä

▶︎
FPSO Cidade de Mangaratiba

▶︎
First oil for FPSO Turritella

▶︎
