(UNRENOVATED) 300 Wing Staff Unisex Restroom Tour (1/2) | Maria’s Closet | New Braunfels, TX

[Video Record On February 24 2026] This one go to used be (Former Lamar Elementary School) is at 240 N Central Ave it was built in 1924 and has additions this one is built in 1950, 1961, 1988, 1990 and 2002, and this one is not renovated because is starting in summer 2026, but this one is now Two Rivers High School is at the 100 Wing/200 Wing and DAEP is at the 400 Wing and Maria’s Closet is at the 300 Wing because apparently we moved to different location at 158 Word Pkwy. The new Lamar Elementary School has opened in 2025 2026 school year. I’ve heaven’t we has two staff restrooms at 300 wing, and the doors we won’t closed all way by myself while people is coming out of the restrooms. And we has the original floor at the staff restrooms we does not Benn replaced from 2002 renovation because the 2024 bond we are doing restroom renovations while doing interior finishes, the boys and girls restrooms we has floor tiles and we doesn’t not have floor tiles in the staff restrooms and we has the back wall tiles in the staff restrooms. Also the door back inside the restroom we doesn’t not paint to white during 2023 renovation because we going to stay yellow. Also the different door handle has been replaced about couple years ago at the staff restroom #1 is in the middle side of the door, but we has the different lock without button to lock and unlock the door we doesn’t not have a button. But we has sign on the door we says “take your key door is always locked, do not press the button when leaving room, for complete privacy when in room-press button”. This toilet has been replaced never 2020s Kohler Kingston Ultra from Crane Plumbing Placidus. Fixtures: 2020s Kohler Kingston Ultra