A 40, Rheinbrücke Neuenkamp: Rückbau der Bestandsbrücke (Visualisierung)

Following the commissioning of the first section of the new Neuenkamp Rhine Bridge on the A40 motorway in November 2023, the existing bridge is now being demolished. Only then can the second new bridge section be erected. The animated film shows the dismantling process in detail. This is the first time in Germany that a cable-stayed bridge of this size is being dismantled in this way. Prior to the dismantling, the old bridge had to be reinforced to withstand the loads. © TAKE IT MEDIA GmbH