INÍCIO DAS OBRAS DO LOTE 3 ÁGUAS CLARAS PIATÃ COM 10,5 KM DE EXTENSÃO, veja
START OF CONSTRUCTION ON LOT 3 ÁGUAS CLARAS PIATÃ WITH 10.5 KM OF EXTENSION, see Don't click here: https://www.youtube.com/c/METROLINHA1... Considered a historic milestone for mobility in Salvador and the Metropolitan Region (RMS), the Light Rail Vehicle (VLT) received authorization to begin construction in June 2024. In July, the purchase of electrical equipment and 40 trains in partnership with the Government of Mato Grosso was formalized. The VLT will have approximately 40 km of extension, with 42 stops. • Section 1: Ilha de São João – Calçada: 16.66 km; 19 stops between Ilha de São João and Calçada + Calçada Station - Calçada - Comércio Extension with 3.58 km of single permanent track. • Section 2: Paripe – Águas Claras: 9.20 km; 8 stops between Paripe and Águas Claras • Section 3: Águas Claras – Piatã: 10.52 km. 9 stops between Águas Claras and Piatã The Light Rail Transit (VLT) will be physically and operationally integrated with other city transportation systems, including the Salvador and Lauro de Freitas Metro System (SMSL), at two points: Águas Claras and Bairro da Paz. Acquisition of trains from the state of Mato Grosso: The 40 trains acquired from the state of Mato Grosso have already been transported to the CAF factory, located in Hortolândia (SP), (learn more details here), where they will undergo a technical and operational re-establishment process, to later be sent to Salvador (BA), in the second half of 2025, where dynamic tests, commissioning and issuance of acceptance certificates will be carried out. [The last sentence appears to be a separate, unrelated comment: "INJURE THE ELEVATED SECTION 3 ÁGUAS CLARAS PIATÃ, see..."]

We Relocated the Handwheel on Our MONSTER Lathe | Megabore Lathe Setup

MANGABEIRA RIVER - check the progress of the works in Itapuã

CONSTRUCTION: SALVADOR VLT DERBA ROAD TRACK PROGRESS|ELEVATED SECTION UPDATES#construction #light...

SEE THE NEW ROAD, 649 ITABUNA TO ILHÉUS, traveling through the northeast, #br101 #itabuna #ilheus...

I Went to China to Buy a $5,000 Modular Home — What's the Real Cost?

I RODE THE NEW SALVADOR LIGHT RAIL - See All the Details

SALVADOR LIGHT RAIL - Updates on Calçada and São Joaquim Station

I WENT TO CHECK OUT THE DEMOLITION OF PIRIPIRI STATION, see for yourself

FOLLOW THE DEMOLITIONS AND EXPROPRIATIONS IN LOBATO, see

VN24 - MB UNIMOG Pulls a 40-ton Semi-Truck Out of a Ditch on the Interstate A44

SALVADOR-ITAPARICA BRIDGE: How is this construction finally progressing?

A Ponte Salvador-Itaparica: A Megaobra que pode Transformar a Bahia

How Stuttgart 21 became a multi-billion dollar sinkhole - and what happens next | Behind the Signal

DERBA ROAD SECTION 2 TRACKS REACH BR 324, check it out

Cały dzień jem jak chiński robotnik

⁴ᴷ⁶⁰ Mountain Railway to ALASKA | White Pass & Yukon Route Driver's View to Skagway

The BIGGEST projects that will CHANGE Brazil in 2026 and that ALMOST NO ONE KNOWS ABOUT...

ILHÉUS: How to cross the city towards ITACARÉ, traveling through the Northeast #ilhéus #bahia #br

Obra da Serra das Araras – Julho de 2026 | Imagens Aéreas de Drone Neo 2

