Rail Baltica Raplamaa mainline section I (part III - 02.09.2025)

CURRENT WORKS: Construction of the embankment lower layers is moving along with some sections being built on geotextiles. Embankment lower layers are being built with most culverts completed and ready to disappear into the embankment. Sihi road tunnel is also slowly beginning to disappear into the embankment. GENERAL INFORMATION: Third part of Rail Baltica Raplamaa section I from a local road in the middle of some fields (Pk Pk 6+800 - Pk 9+400) or about 2,6 km. Flight with Mavic 3 at an altitude of 50 meters. LANDMARKS: Start on a smaller local road with various ditches crossing the future railway line with the first significant structure Künka road viaduct, which is shortly followed by Loone ecoduct. This is followed by the Sihi road tunnel (light traffic) and the flight terminates, where second section of Rail Baltica Raplamaa mainline begins.