Building in Ghana - 4 Bedroom Complete Structural with Estimates #buildinginghana

#buildinginghana #lifeinghana #ghanaians #building #buildingahouseinghana #buildingworks #4bedroom In todays video, i’m excited to share with you the full comprehensive breakdown of putting up a structural 4-Bedroom Apt. from scratch. Due to funding limitations, this project spanned from June 26, 2023, to January 15, 2025. To manage the project efficiently, we divided it into two distinct phases: Phase 1: Setup to Lintel Stage Phase 2: Lentil to Roofing Course Find Below the Estimates; Complete Structural Cost 5” Hollow Blocks : 3,100 PCS = 21,670 GHS 58 Bags of 32.5r Cement (Block Laying) = 4,708 GHS 35 Bags of 42.5r Cement (Concrete Works) = 3,275 GHS Block Laying Workmanship = 8,740 GHS Concrete Works Workmanship = 4,050 GHS 2 Trips of Sand = 5,400 GHS 1 Trip of stones = 2,800 GHS 14MM Rod : 24 PCS = 1,980 GHS 12MM : 68 PCS = 4,764 GHS 3/8MM : 32 PCS = 599.5 GHS Binding Wire : 3 Coil = 230 GHS Steel Bender’s Workmanship = 2,250 GHS Wood : Cyber Board + Bush Cut = 5,035 GHS Nails (4”,3”,W.Nail) = 900 GHS Carpenter’s Workmanship = 3,600 GHS Miscellaneous & T&T = 2,590 GHS Water Fetched = 225 GHS TOTAL : 72,816.5 GHS Cost Breakdown by Phases; Phase 1 (ONLY) - Setup to Lentil Stage 5” Hollow : 1,700 PCS X6.5 : 11,050 GHS Cement (32.5r): 20 Bags X72 : 1,440 GHS Cement (Gacem 42.5r) : 20 Bags X97&80: 1,685 GHS Miscellaneous : 730 GHS Continual Pillars : 14MM (24) X82: 1,968 GHS 3/8 : 10PCS X16 : 160 Binding Wire 1 : 70 Steel Bender Workmanship: 900 Wood for Lentil + T&T (25)X85: 2,350 Carpenter Labor(Pillars + Lentil): 1,400 Nails : 450 GHS Mason + Laborer Block Laying : 3,260 Mason + Laborer Concrete : 1,350 Other T&T : 200 TOTAL for Setup to Lentil Stage: 27,025 GHS Phase 2 (ONLY) : Lentil To Roofing Course 12mm : 30 X 65.60 = 1,968 GHS 12mm : 38 X 73.60 = 2,796 GHS 🔺 3/8mm : 10 X 17.50 = 175.50 GHS 3/8mm : 12 X 22 = 264 GHS 🔺 Binding Wire : 2 Coil = 160 GHS Steel Bender Workmanship : 1,350 GHS Cyber Board : 25 X 85 + Cutting : 2,350 GHS Bush Cut : 7 X 80 GHS : 560 GHS Nails : 4”(2), 3”(3) X 70 : 450 GHS Carpenter : 2,200 GHS Cement (42.5r) : 15 X 106 = 1,590 GHS Cement (32.5r) : 38 X86 = 3,268 GHS Lentil Concrete Casting : 2,700 GHS Blocks Laying Labor: 5,480 GHS 5” Blocks(2) : 1,000 X 7.5 = 7,500 GHS 5” Blocks(2) : 400 X 7.8 = 3,120 GHS GHS Sand : 2 Trips = 5,400 GHS Stones : 1 Trip = 2,800 GHS Miscellaneous : 1,000 GHS T&T : 660 GHS Water : 225 GHS Total : 45,791.50 GHS GROSS TOTAL : 72,816.5 GHS Mason’s Contact Name: Mr. Attah (Mason) Phone Number: 0555434760 Thank you for Watching!

Building in Ghana - Cost Of Decking A House With Current Cost Of Materials
▶︎

Building in Ghana - Cost Of Decking A House With Current Cost Of Materials

How to Build Your Dream House in Ghana Without a Big Salary
▶︎

How to Build Your Dream House in Ghana Without a Big Salary

Don't Even Try To Use Electric Fence 4 Ur Building Here In Nigeria.YOU WILL REGRET IT
▶︎

Don't Even Try To Use Electric Fence 4 Ur Building Here In Nigeria.YOU WILL REGRET IT

3-bedroom self contain renovation to roofing level #construction #Renovation #Home design
▶︎

3-bedroom self contain renovation to roofing level #construction #Renovation #Home design

COST OF BUILDING (FINISHES) IN GHANA 2026
▶︎

COST OF BUILDING (FINISHES) IN GHANA 2026

Building in Ghana - Roofing Complete With Estimate - Full Cost
▶︎

Building in Ghana - Roofing Complete With Estimate - Full Cost

Building in Ghana - Electricals Final Stage with Cost and Workmanship #buildinginghana
▶︎

Building in Ghana - Electricals Final Stage with Cost and Workmanship #buildinginghana

Building in Ghana: Working with Sloped Land
▶︎

Building in Ghana: Working with Sloped Land

How Much I’ve Spent Building My 7-Bedroom House in Ghana (2022-2026)
▶︎

How Much I’ve Spent Building My 7-Bedroom House in Ghana (2022-2026)

B4 You jump to bungalow, why not compare cost to see if there is any significant difference
▶︎

B4 You jump to bungalow, why not compare cost to see if there is any significant difference

Building in Ghana: Roofing Update After 6 Months | The Real Condition
▶︎

Building in Ghana: Roofing Update After 6 Months | The Real Condition

Building in Ghana | Cost of Building a 4-Bedroom house in Ghana | Ep-1 #buildingingghana #cost,
▶︎

Building in Ghana | Cost of Building a 4-Bedroom house in Ghana | Ep-1 #buildingingghana #cost,

Cost of Decking a House in Ghana | Materials, Labor, and other Expenses | Building in Ghana
▶︎

Cost of Decking a House in Ghana | Materials, Labor, and other Expenses | Building in Ghana

Building in Ghana - Tiling Work Complete with Estimate #buildinginghana
▶︎

Building in Ghana - Tiling Work Complete with Estimate #buildinginghana

Building in Ghana - How To Reduce Labor Cost in Tiling Work #buildinginghana
▶︎

Building in Ghana - How To Reduce Labor Cost in Tiling Work #buildinginghana

Storey Building vs Bungalow - Building in Ghana 🇬🇭
▶︎

Storey Building vs Bungalow - Building in Ghana 🇬🇭

How to Build Your First House with a Small Salary
▶︎

How to Build Your First House with a Small Salary

Cost of building a 2 bedroom complete Off-grid house with Solar and Borehole
▶︎

Cost of building a 2 bedroom complete Off-grid house with Solar and Borehole

Building in Ghana: Project update
▶︎

Building in Ghana: Project update

Estimate of Average Cost of a (2-Storey) 4-Bedroom House on Half-Plot of Land (Ep 1) No of baths 5.5
▶︎

Estimate of Average Cost of a (2-Storey) 4-Bedroom House on Half-Plot of Land (Ep 1) No of baths 5.5