HS2 Streethay Birmingham WCM 2025
The design of the railway at Streethay was changed to a cutting during the Parliamentary stages, to reduce the visual impact of HS2 in the area. The construction of three bridges will enable the HS2 line to pass under the A38 in a retained cutting. We constructed and installed Streethay Overbridge (South Staffordshire Railway) in 2023. The construction of the A38 Southbound Slip Overbridge is nearing completion prior to the commencement of the A38 Rykneld Street Overbridge. Watch on YouTube - Streethay Overbridge Overbridge design In June 2022, we announced that HS2’s designers have reduced the length of wall structures for the railway at Streethay from 1.6 km (1 mile) to 420 metres, meaning 80% less concrete will be needed, supporting HS2’s ambition to cut carbon on the project. This will save around 70,000 cubic metres of concrete, the equivalent to 6,700 concrete mixer lorry loads. In total, around 420,000 tonnes of carbon has been saved in this area of the project. The railway will pass through Streethay in a cutting, and the shortening of the retaining structures also means the community will experience less noise and disruption during construction because fewer large machines will be needed on site. Most of the Streethay cutting will now have sloping earth banks, improving the visual appearance of the railway and increasing the opportunity for wildlife habitats and landscape planting to protect against noise from the railway. The updated design also results in a shorter diversion of Fulfen Wood watercourse. Once these bridges are complete, they will enable the construction of Streethay Cutting for which we will need to excavate and transport approximately 750,000m of earth. This is equivalent to approximately 300 Olympic swimming pools. The earth will be used to form embankments along the line, close to Streethay, in Curborough and Kings Bromley. 00:00 Looking north at the site of Capper's Lane Overbridge and the West Coast Main Line Overbridge (opened July 2023) 02:04 Streethay Footpath 6 Overbridge (site) 02:12 South Staffordshire Line Overbridge (opened July 2023) 02:35 A38 Southbound Slip Road Overbridge (opened June 2024) 03:06 A38 Rykneld Street Overbridge 09:10 The old Capper's Lane Bridge can be seen here 09:18 Capper's Lane Viaduct (site) 09:30 Whittington Common Cutting 09:50 Darnford Lane Overbridge (site) 10:05 Whittington Heath Embankment 10:15 Lichfield Road Underbridge (site) 10:35 Whittington Footpath 16 Underpass (site) Royalty Free Music: https://www.bensound.com Artist: Lunar Years License code: DK86VXXWAIY5PTIO A content creater using you tube

Is This the New HS2 Saltley Viaduct?

The Station Emerges! U-Beams are on the move! HS2 Curzon St

Hs2 All areas Birmingham,Banbury, Delta junction recap 2024massive progress £180 billon and rising

Why Lichfield's Canal Project Is So Important

Brabazon: A new UK city?

PROGRESS UPDATE - HS2 BURTON GREEN TUNNEL - FRIDAY 12TH JUNE 2026 - AMAZING PROGRESS SEEN TODAY !!!!

Baker Viaduct Reaches Another Huge Milestone (Trans Pennine Route Upgrade)

What is happening inside the Brenner Base Tunnel right now

Unbelievable Smart Worker & Hilarious Fails | Construction Compilation #7 #adamrose #smartworkers

HS2 Birmingham-Manchester A38 Streethay uncut massive progress 2025

The €7BN Mega-Canal That Will Reshape Europe

HS2 £100m Mega Green Tunnel Chipping Warden Nears Completion 🏗️ & Edgcote Viaduct 4K Drone Flight! 👀

Curzon No.2 gets a huge new crane! SPMT U-Beam lifter moved!

HS2 fly through of the Phase One route between Birmingham and London

⚡️Historic day for TRU as Deighton and Bradley get their first masts for electrification🙌

Rugby & District from Above - HS2 Quarry update - January 2025

Weekend motorway closures caused by HS2 works are set to hit travellers

China’s Secret | The Most Unbelievable Megaprojects in China | 4K Travel Documentary

How It Works, the HS2 Launching Girder 'Dominique' as it builds the Colne Valley Viaduct.

