Fred. Olsen Windcarrier on Moray East Offshore Wind Farm
14 September 2021, Fred. Olsen Windcarrier's installation vessel Blue Tern installed the last of 100 turbines on Moray East offshore wind farm well ahead of schedule. Moray East is Scotland's largest offshore windfarm to date with 100 V164-9.5 turbines. Bold Tern installed the first turbines on Moray East in January 2021 but was later replaced by Blue Tern to undergo a scheduled crane upgrade. A carefully planned vessel substitution was successfully carried out in May where Blue Tern was delivered fully loaded on the Moray East site. The overlap helped to improve the project schedule. Read more here: https://windcarrier.com/track-record/...

▶︎
Engineering the World's Largest Offshore Wind Farm: the London Array | Blueprint

▶︎
WIND FARM ASSEMBLY Off The Coast Of Sylt - Millimeter Work In All Weathers | Full Documentary

▶︎
Upgrades on Brave Tern and Bold Tern

▶︎
Wikinger Offshore Wind Farm Installation - Full Length

▶︎
Blue Tern @ Rotterdam Offshore Group

▶︎
The FULL VIDEO of Trump they didn’t want released

▶︎
On Board Fred. Olsen Windcarrier's the Brave Tern

▶︎
Block Island Offshore Wind Farm

▶︎
Floating wind turbines: Offshore energy's secret weapon

▶︎
How US Air Force B 52 Pilot Performed an Emergency Takeoff at Full Speed

▶︎
Offshore installation vessel Aeolus

▶︎
How Europe Has Been Sinking 18 km of Concrete Into the Sea for Over a Decade to Build This Tunnel

▶︎
Norway is Building The World's Deepest Mega-Tunnel

▶︎
Unbelievable Smart Worker & Hilarious Fails | Construction Compilation #7 #adamrose #smartworkers

▶︎
offshore wind turbines: maintenance by helicopter

▶︎
How it all comes together at sea: installing an offshore wind farm

▶︎
Moray East Offshore Windfarm

▶︎
Watch Ukrainian Drones OBLITERATE a Russian Jet

▶︎
How Norway Is Building the World’s First Tunnel for Ships Through a Mountain

▶︎
