Regenerare urbană cartier Fabric - Stadiu lucrări 18.06.2026 Timișoara #porr

Previous stage:    • Regenerare urbană cartier Fabric - Stadiu ...   PORR Construct 18.03.2026-18.03.2028 34 million euros (14 million through ADR Vest) Stage I: Dacilor and Ștefan cel Mare streets, Traian Square, Romanilor Square, Episcop Joseph Nischbach and Episcop Joseph Lonovici streets Stage II: Zăvoi street, in Petru Rareș Square and Corneliu Micloși Square. Stage III: Traian Square and Corneliu Micloși Square, 3 August 1919 Boulevard and Ion Mihalache Street. Stage IV: Traian Square, Corneliu Micloși Square, 3 August 1919 Boulevard, Ion Mihalache Street, Costache Negruzzi, Ecaterina Teodoroiu and Petre Ispirescu Streets. Stage V: Traian Square, 3 August 1919 Boulevard, Ion Mihalache Street, Serbian Orthodox Church area, Anton Pann and Constantin Titel Petrescu Streets. Stage VI: Costache Negruzzi, Ecaterina Teodoroiu, Petre Ispirescu, Anton Pann and Constantin Titel Petrescu Streets. #drone #infrastructure #architecture #timisoara #infrastructure #roadinfrastructure