Custom House Open Day & some climbing lifts
This was at the 'Behind the hoardings' event at Crossrails Custom House Station on 23rd of March 2018 which is still under construction. It was interesting to see and afterwards I took a look at the Alimak Hek climbing lifts at nearby Royal Victoria Bridge. They are unique in that these ones are installed for use by the public but are usually installed on construction sites. They break down quite often and this is one of the first times I've found them working!

▶︎
Building London’s Elizabeth Line | Impossible Engineering | Full Episode

▶︎
GROWL! Lifts with ATTITUDE - ONE YEAR to finally get the footage!

▶︎
Another look at those broken Schindler's

▶︎
A Train Comes Off The Tracks! | Paddington Station 24/7 | Full Episode

▶︎
Step back in time... The Schindler 1962 electro-MECHANICAL lift!

▶︎
Stuttgart 21 - verplant, verbaut, verschoben. Von falschen Kabeln und doppelten Signalen | SWR Doku

▶︎
How do Elevators Work?

▶︎
Most Ridiculous Worker Mistakes Caught on Camera

▶︎
Fast Mitsubishi Lifts

▶︎
The Dark Story of Britains Most Doomed Palace - Buckingham

▶︎
How does a Spiral Escalator work?

▶︎
How does an Elevator work?

▶︎
*CLOSED* End of the Road for Stoke Level Crossing

▶︎
What is Samphire Hoe?

▶︎
Universal Lift Keys and a few lifts

▶︎
Unbelievable Workers | Working with Talented Engineers #46 #fail #adamrose #smartworkers

▶︎
My Project - Level Crossing Barrier in my back yard (09/04/2020)

▶︎
Amazing Dangerous Building Demolition Excavator Skill - Biggest Heavy Equipment Machines

▶︎
Some of the lifts at the Koelnmesse in Germany

▶︎
