TransLink Expo Line SkyTrain - Waterfront to King George (2026)

This is a video of the entire journey onboard TransLink's Expo Line, one of the three SkyTrain routes in Metro Vancouver. The Expo Line was opened between 1985 and 1993 in stages - first to New Westminster in time for the 1986 Transport Expo, and then extended to Columbia and over the Fraser River via the 'Skybridge' to the city of Surrey in 1991 and again further into Surrey in 1994. Columbia station is the junction with the second branch of the Expo Line to Production Way/University, which opened as part of the Millennium Line in 2002; it changed to Expo Line branding in late-2016 prior to the Evergreen extension of the Millennium Line opening from Lougheed Town Centre in Burnaby to Lafarge Lake-Douglas in Coquitlam. We ride aboard Skytrain 6131-6145, a 2025-built Alstom Innovia Metro Mark 5 (set number 7). At the end of the video we see the King George tailtrack and a glimpse of the future extension to Langley Centre, and full views of the train departing from King George back to Waterfront.

Vancouver SkyTrain and Canada Line In Action - April-May 2018
▶︎

Vancouver SkyTrain and Canada Line In Action - April-May 2018

Vancouver Skytrain Expo Line: 🚊 THE COMPLETE End-to-End Front Seat Ride (4K)
▶︎

Vancouver Skytrain Expo Line: 🚊 THE COMPLETE End-to-End Front Seat Ride (4K)

Expo Line: Waterfront to Main Street [single-tracking | TransLink (SkyTrain)
▶︎

Expo Line: Waterfront to Main Street [single-tracking | TransLink (SkyTrain)

Vancouver SkyTrain - Expo Line (King George to Waterfront)
▶︎

Vancouver SkyTrain - Expo Line (King George to Waterfront)

Metro Vancouvers Future Transit Plans
▶︎

Metro Vancouvers Future Transit Plans

Vancouver SkyTrain Tour - Front Window View | Expo Line Waterfront to King George
▶︎

Vancouver SkyTrain Tour - Front Window View | Expo Line Waterfront to King George

MANCHESTER METROLINK – Etihad Campus to Altrincham – Driver's Eye View (2026)
▶︎

MANCHESTER METROLINK – Etihad Campus to Altrincham – Driver's Eye View (2026)

Is Regional Rail the Future of British Columbia?
▶︎

Is Regional Rail the Future of British Columbia?

⁴ᴷ⁶⁰ Vancouver SkyTrain Front Window View - Expo Line to Waterfront
▶︎

⁴ᴷ⁶⁰ Vancouver SkyTrain Front Window View - Expo Line to Waterfront

Vancouver Skytrain 4k: Expo Line [Waterfront - King George] (Full Ride in 2020)
▶︎

Vancouver Skytrain 4k: Expo Line [Waterfront - King George] (Full Ride in 2020)

Vancouver SkyTrain Ride | Expo Line to King George
▶︎

Vancouver SkyTrain Ride | Expo Line to King George

SkyTrain around Metro Vancouver part 31
▶︎

SkyTrain around Metro Vancouver part 31

⁴ᴷ⁶⁰ Vancouver SkyTrain Front Window View - Expo Line to Production Way-University
▶︎

⁴ᴷ⁶⁰ Vancouver SkyTrain Front Window View - Expo Line to Production Way-University

Vancouver SkyTrain and Canada Line In Action - August-September 2016
▶︎

Vancouver SkyTrain and Canada Line In Action - August-September 2016

Vancouver Built the Perfect Metro - Why Won't Anyone Else?
▶︎

Vancouver Built the Perfect Metro - Why Won't Anyone Else?

Vancouver's 85+km Rapid Transit Expansion
▶︎

Vancouver's 85+km Rapid Transit Expansion

⁴ᴷ⁶⁰ Vancouver SkyTrain Front Window View - Expo Line from Production Way-University to Waterfront
▶︎

⁴ᴷ⁶⁰ Vancouver SkyTrain Front Window View - Expo Line from Production Way-University to Waterfront

Riding the Entire Vancouver SkyTrain System - All Stations | All Lines | Full System Tour
▶︎

Riding the Entire Vancouver SkyTrain System - All Stations | All Lines | Full System Tour

SkyTrain | Millennium Line | VCC-Clark to Lafarge Lake Douglas | Full Ride
▶︎

SkyTrain | Millennium Line | VCC-Clark to Lafarge Lake Douglas | Full Ride

Buses in Vancouver, BC (Volume Twenty-Seven)
▶︎

Buses in Vancouver, BC (Volume Twenty-Seven)