Volgograd Arena - Cable-stayed roof lift
In the city of Volgograd in southern Russia, Victory Arena currently under construction is a new stadium, built with the purpose of serving as one of the venues of the FIFA 2018 World Cup. In July 2017, Freyssinet’s teams have carried out the assembling and the lifting of the cable-stayed roof of the arena.

▶︎
Inside WREXHAM's £90m Racecourse EXPANSION

▶︎
How a Student's Question Saved This NYC Skyscraper

▶︎
New Cable Roof for Ciutat de Valencia Stadium

▶︎
These buildings are ugly. But the idea was genius.

▶︎
🚗 BYD : The biggest SCAM of the car industry ?

▶︎
Transformation of the former London 2012 Olympic Stadium

▶︎
Unbelievable Workers | Working with Talented Engineers. EP48 #construction #smartworkers

▶︎
American Trucks And Ships Are Falling Behind

▶︎
Thu Thiem 2 Stay cable bridge, Hô Chi Minh in Vietnam

▶︎
Incredible Stadium Retractable Roof Designs | TFC Stadiums

▶︎
Top 15 Retractable Roof Stadiums in Europe

▶︎
Stadiums That Literally Move — The Most Advanced Stadium Mechanisms in the World

▶︎
A digital sprint: from concept design to World Cup stadium in 12 months

▶︎
The $8B Canal Set to Change Europe — And No One Is Talking About It

▶︎
Une nouvelle toiture pour le Stade olympique

▶︎
Hyper Future England´s Stadiums

▶︎
Unbelievable Smart Worker & Hilarious Fails | Construction Compilation #18 #construction #adamrose

▶︎
246 meter elevator test tower - Project manager Holger Hinz guides through the TK Elevator tower

▶︎
The Aral Sea Finally Came Back To Life After Kazakhstan Used The Kokaral Dam To Block A Strait

▶︎
