아파트 10동 동시에 폭발시키는 위력인데, 계속된 실패에 결국 공구장님이 터널로 들어가셨다|인제터널 공사|극한직업|#골라듄다큐

※ This video is an excerpt from *Extreme Jobs - Inje Tunnel Construction Parts 1 & 2*, which aired on January 4, 2012. Deep in the mountains at the foot of Mt. Bangtae in Inje-gun, Gangwon-do, the sound of blasting shaking the sky can be heard every day. This is because construction of the Inje Tunnel, which will shorten the travel time from Seoul to Yangyang to just 1 hour and 40 minutes, is in full swing. Part of the Chuncheon-Yangyang Expressway (88.8 km in length), this tunnel, which cuts through Mt. Bangtae and several other mountains of the Baekdudaegan mountain range, is a whopping 11 km long! This is more than double the length of the Jungang Expressway's Jukryeong Tunnel (4.6 km), currently the longest tunnel in Korea, and ranks 11th in the world. Simultaneous excavation in four directions! The Inje Tunnel, boasting a massive scale with four lanes in each direction! Undeterred by the bitter cold of midwinter, we provide in-depth coverage of the Inje Tunnel construction site, where workers are dedicated to 24-hour operations, shedding light on the valuable sweat of those creating a new path. - In the morning, before the twilight has fully lifted, preparations for tunnel excavation are in full swing. For these workers, there is no distinction between day and night, let alone the season. This is because they are deployed under a 24-hour shift system without a single minute of rest to shorten the construction period. —The term "Makjang," a metaphor for extreme conditions, refers to the tunnel where excavation work is taking place.—The faces of the workers, each wearing a thick mask as they enter the "Makjang," are filled with determination. To reduce the construction period, the Inje Tunnel project is excavating simultaneously across eight sections. The excavation method is carried out using explosive blasting. A staggering 300 kg of explosives is loaded at once to destroy hard rock. The shock wave generated at this time is powerful enough to reach speeds of 5,000 meters per second and possesses the force to blast rocks weighing over 20 kg over 100 meters away. It is a dangerous operation that requires extreme caution for even a single blast! The place where workers sweat day and night to excavate just over 3.5 meters is, quite literally, the "face of the mine"! Once the blast is complete, massive tires that far exceed the height of a sturdy adult appear. These are "rough-ground dump trucks," which even construction veterans rarely see. A line of super-large trucks capable of moving a whopping 50 tons follows. The estimated volume of rock excavated upon completing the 22 km round-trip tunneling is 2.6 million cubic meters! As befits a site boasting a world-class scale, the massive heavy equipment mobilized overwhelms that of other construction sites. The quiet face of the mine just before the blast. The tense countdown to the explosion! However, even as silence falls, no loud bang is heard. The explosives have not detonated. Unable to pinpoint the cause, the supervisor eventually decides to enter the tunnel face. 300 kg of explosives are waiting to explode! Since tunnel construction is prone to frequent accidents, reinforcing workers' safety awareness is essential. A ritual praying for safety is performed to guide their mindset as they approach the site. However, accidents, big or small, can occur anywhere; in this instance, the tires of a vehicle heading to the face have collapsed due to sharp rocks. As a single delay affects other operations, the worker repairing the vehicle is even more anxious. Just as important as the excavation itself is reinforcing the roughly damaged surface. This involves shotcrete application, spraying concrete onto the walls, and installing rock bolts to firmly secure the rocks. The high-difficulty task of driving 2-meter rebar into the rock while relying on a crane continues ceaselessly. Just then, the workers on site discover a dangerously protruding crack in the tunnel ceiling... About ten tasks are carried out organically for a single excavation run. However, the excavation range is merely 3.5 meters. These individuals, fighting while enduring twelve hours of grueling labor a day, approach their work solely with a sense of mission to build a ‘new road.’ The completion of the Inje Tunnel is expected to result in an annual reduction of 13,947 tons of carbon dioxide, a saving of 1.3 billion won in logistics costs, the creation of 1.1 million jobs, and an increase in income of 1.9 trillion won. ✔ Program Title: Extreme Jobs - Inje Tunnel Construction Parts 1–2 ✔ Broadcast Date: 2012.01.04

10분 거리에서 두 시간 잡았는데 어민 다 먹여살린다. 그물 던지는 대로 만선이었던 주문진항 24시│양미리잡이│극한직업│#골라듄다큐
▶︎

10분 거리에서 두 시간 잡았는데 어민 다 먹여살린다. 그물 던지는 대로 만선이었던 주문진항 24시│양미리잡이│극한직업│#골라듄다큐

[인간극장] "서로의 뜻이 잘 맞았어요" 12살 연하 남편과 함께 암을 극복하며 살아가는 그녀의 삶 | KBS 방송
▶︎

[인간극장] "서로의 뜻이 잘 맞았어요" 12살 연하 남편과 함께 암을 극복하며 살아가는 그녀의 삶 | KBS 방송

없는게 없다❗ 모든 걸 훔친 🛠️절도계 맥가이버⚒️  | Y드라이브
▶︎

없는게 없다❗ 모든 걸 훔친 🛠️절도계 맥가이버⚒️ | Y드라이브

제대로 만들 수밖에 없다 "내가 죽지 않으려면"|아찔한 절벽 위 중국 잔도공이 사는 법|레전드|극한직업|#골라듄다큐
▶︎

제대로 만들 수밖에 없다 "내가 죽지 않으려면"|아찔한 절벽 위 중국 잔도공이 사는 법|레전드|극한직업|#골라듄다큐

"급하다 급해" 천궁-Ⅱ 빨리 실어가려고…한국에 軍수송기 8대 보낸 UAE [뉴스와] / 연합뉴스TV(YonhapnewsTV)
▶︎

"급하다 급해" 천궁-Ⅱ 빨리 실어가려고…한국에 軍수송기 8대 보낸 UAE [뉴스와] / 연합뉴스TV(YonhapnewsTV)

일본 중고 선박 사다가 싹 해체해 후진국에 팔아 돈 버는 대한민국|수명 다한 400톤 화물선 어떻게 처리하나 봤더니|폐선박을 분해해 고철로 만드는 폐선처리반|극한직업|#골라듄다큐
▶︎

일본 중고 선박 사다가 싹 해체해 후진국에 팔아 돈 버는 대한민국|수명 다한 400톤 화물선 어떻게 처리하나 봤더니|폐선박을 분해해 고철로 만드는 폐선처리반|극한직업|#골라듄다큐

"금이 이렇게 만들어지는 거였어?" 신기한 골드바 제조과정, 금은 이렇게 만들어진다|극한직업
▶︎

"금이 이렇게 만들어지는 거였어?" 신기한 골드바 제조과정, 금은 이렇게 만들어진다|극한직업

물동량 1억 톤. 한국 수출이 시작되는 곳 항만 24시|평택항|극한직업|#골라듄다큐
▶︎

물동량 1억 톤. 한국 수출이 시작되는 곳 항만 24시|평택항|극한직업|#골라듄다큐

단군 이래 최대의 국책 사업. KTX 노선 고속철도 설치하는 과정|콘크리트 침목을 사용한 궤도 공법 레다2000|극한직업|#골라듄다큐
▶︎

단군 이래 최대의 국책 사업. KTX 노선 고속철도 설치하는 과정|콘크리트 침목을 사용한 궤도 공법 레다2000|극한직업|#골라듄다큐

강원도 양양은 지금 MZ 서퍼들의 핫플! 초고령화 마을 주민들과 서핑 족의 행복한 동거는 가능할 것인가 | 양양, 서퍼와 만나다 | KBS 20170805 방송
▶︎

강원도 양양은 지금 MZ 서퍼들의 핫플! 초고령화 마을 주민들과 서핑 족의 행복한 동거는 가능할 것인가 | 양양, 서퍼와 만나다 | KBS 20170805 방송

이 부대 없으면 대한민국 국방력 무력화|해외에서도 찾는다는 대한민국 0.01% 부대의 정체|심정 중대|극한직업|#골라듄다큐
▶︎

이 부대 없으면 대한민국 국방력 무력화|해외에서도 찾는다는 대한민국 0.01% 부대의 정체|심정 중대|극한직업|#골라듄다큐

Korea’s No.1 Conger Eel Catch: Exported to Japan the Moment It’s Caught #PICKDOCU
▶︎

Korea’s No.1 Conger Eel Catch: Exported to Japan the Moment It’s Caught #PICKDOCU

한국에도 있구나.. 상상초월 300톤 폐선박을 순식간에 가루로 만드는 현장│거대 선박 해체하는 모든 과정│극한직업│#골라듄다큐
▶︎

한국에도 있구나.. 상상초월 300톤 폐선박을 순식간에 가루로 만드는 현장│거대 선박 해체하는 모든 과정│극한직업│#골라듄다큐

The Dangerous 120-Hour Process of Crafting Wooden Houses from Massive Logs
▶︎

The Dangerous 120-Hour Process of Crafting Wooden Houses from Massive Logs

“대게랑 홍게는 노는 물이 달러!” 수심 2,000m에서만 잡히는 붉은 보석 홍게, 어부가 알려주는 맛있는 홍게 고르는 법 / 강릉 주문진시장 / #바다다큐
▶︎

“대게랑 홍게는 노는 물이 달러!” 수심 2,000m에서만 잡히는 붉은 보석 홍게, 어부가 알려주는 맛있는 홍게 고르는 법 / 강릉 주문진시장 / #바다다큐

[Full] Retirement Bankruptcy, Living Because I Can't Die | Tracking 60 Minutes KBS Broadcast 05/2...
▶︎

[Full] Retirement Bankruptcy, Living Because I Can't Die | Tracking 60 Minutes KBS Broadcast 05/2...

“전쟁 터지면 다 밝혀질 것”미국,유럽 강대국들 당황한 한국 실제 군사력 수준l 국경없는 클래스 EP.15 (이세환 군사전문가 2부)
▶︎

“전쟁 터지면 다 밝혀질 것”미국,유럽 강대국들 당황한 한국 실제 군사력 수준l 국경없는 클래스 EP.15 (이세환 군사전문가 2부)

부식되고 누수까지 시작된 수십억 강남아파트 외벽 수리하는 과정|아파트 크랙 보수|극한직업|#골라듄다큐
▶︎

부식되고 누수까지 시작된 수십억 강남아파트 외벽 수리하는 과정|아파트 크랙 보수|극한직업|#골라듄다큐

"수류탄 100배 위력" K9 자주포 고폭탄부터 소총탄까지|군대 탄약고에서 꺼낸 5천 발 폭발물 한 번에 터뜨렸더니|육군 EODT 폭발물 처리반의 하루|극한직업|#골라듄다큐
▶︎

"수류탄 100배 위력" K9 자주포 고폭탄부터 소총탄까지|군대 탄약고에서 꺼낸 5천 발 폭발물 한 번에 터뜨렸더니|육군 EODT 폭발물 처리반의 하루|극한직업|#골라듄다큐

An Incredible Sight: Fish That Jump Aboard by Themselves, Traditional Japanese Skipjack Tuna Fish...
▶︎

An Incredible Sight: Fish That Jump Aboard by Themselves, Traditional Japanese Skipjack Tuna Fish...