Link-Belts Complete Heavy Picks, Work $1.3B GDOT Project
Link-Belt crawler cranes are vital to a massive infrastructure renovation issued by the Georgia Department of Transportation (GDOT). Utilizing a 200-ton 248 HSL and a 150-ton 238 HSL, C.W. Matthews of Marietta, Georgia, is the lead construction contractor on the $1.3 billion project. “These Link-Belt cranes are made dependable,” C.W. Matthews operator Ronald Carter said. “They can do just about anything you want in terms of lifting materials of all kinds.” • • Follow Link-Belt Cranes: Website: https://www.linkbelt.com/ LinkedIn: / linkbeltcranes Instagram: / linkbeltcranes X: https://x.com/LinkBeltCranes YouTube: / @linkbeltcranes Threads: https://www.threads.net/@linkbeltcranes #linkbelt #crane #americanbuilt #crawlercrane #construction

Link-Belt 348 Lattice Crawler Assists Water Facility Upgrade

Transporting The Manitowoc 4600 | Carl's Dragline Service

Worst Plane Landing Fails Caught on Camera

Total Idiots at Work Caught on Camera | Best of 2024

Going Vertical - Standing concrete panels on this 50K SQFT building.

Overloaded Sand Ship Fails While Fighting Upstream At The Dam Gate

Liebherr – Millionenschaden nach schwerer Havarie

How Do You Move 3 WRECKED Locomotives?

🚧 Building the world's strongest land-based crane! 🛠️

Extreme Heavy Equipment Documentary | Crawler Cranes, Heavy Transport and Oil Rig Moves

Link-Belt 248 HSLs Work Dam Renovation Projects

24 Most Terrifying Moments of Boats and Ships Launch Failures Caught on Camera

Liebherr 1650 Threads a 20,000 lb Chiller Through a Roof Hatch

Manitowoc MLC100-1 Assembly Overview

Why is the US Army Building a $4B Reservoir to Save the Everglades?

120|RT Excels on $2.25B New York Mega Project

Worst Plane Landing Fails Caught on Camera

The Deepest Our Plow Has Been Stuck!!!

Never Buy a Water Pump Again! A 65-Year-Old Plumber Made His Own Water Pump Using PVC Pipes | Update

