two Hitachi 350 bridge demolition
"There is currently no demolition work underway on a major bridge in Neuss; instead, the bridge at the "Spaghetti Junction" (connecting the A57) is closed due to damage to the substructure, with demolition work scheduled to be completed by mid-September 2025. The Josef Cardinal Frings Bridge (South Bridge) between Neuss and Düsseldorf must be demolished and rebuilt because a complete renovation is not possible. The State Road Authority of North Rhine-Westphalia plans to keep the bridge open for traffic through extensive renovation work until the new bridge is completed (in approximately 15 years)." Source: Google AI, September 25, 2026, 8:15 PM

▶︎
Excavator CAT 352 F - Demolition site

▶︎
Radial Gate Stuck in Decades of Silt

▶︎
Idiot Snow Removal: Massive Roof Avalanche | Extreme Dangerous Plow Truck Fails #6

▶︎
Incredible Manufacturing: Top 3 High-Tech Factories —production Crusher Hammer

▶︎
Impossible Places | World's Most Dangerous Roads No One Dares to Cross | 4K Documentary

▶︎
Key Bridge Marriott Demolition (Part 26)

▶︎
Buried Rail, Locomotive Tries to Pass Through

▶︎
Excavator Hitachi KMC 1200S-7 demolition site

▶︎
Super sized transport takes over Cheshire as police escort supergrid transformer

▶︎
Excavator CAT 374 longfront - demolition site

▶︎
Excavator Komatsu PC 490 longfront

▶︎
Excavator Volvo EC 750 HR demolition site

▶︎
First Start New Project Delete Big Pond!! Mega Heavy Truck 25T Unlading & SHANUI Bulldozer Push Soil

▶︎
Top 6 Insane Factory Processes That Will Blow Your Mind

▶︎
Excavator Liebherr R960 - demolition

▶︎
DIY Hand-Dug Well: Complete Process from Start to Finish

▶︎
TOP 20 Incredible Building Demolitions That Collapsed Giants in Seconds | Controlled Explosions

▶︎
Excavator Hitachi 490, CAT 326 and more

▶︎
Ninth Street Demolition (Part 3: Steel)

▶︎
