Working a Carfloat
Some HD video of working the carfloat on my CNJ Bronx Terminal. This video shows the prototypical method for unloading a carfloat. Three of the six cars on the float are pulled off from one side of the float, then all 6 cars on the opposite side, these are stored in the yard. This helps equalize the balance of the float. Then, the three that were left on the outer track are pulled, followed by all the cars on the centre track. Two pulls are all that are required to empty the float. The locomotive has been re-worked with a new High Bass speaker installed by Lew White at Tony's Trains at the NMRA Convention in Hartford. The sound has also been improved with better samples, installed into the QSI Revolution decoder by Josh Shedaker, also at the convention.

Rail Barge

Case File: The Challenger's Fall - Model Railroad Incident

Gapping Complex Trackwork

Unloading the Carfloat at the Long Island Rail Road (1)

Erie Railroad Carfloat Operations in Chicago, 1920

Easrern Shore - Bay Coast Railroad loading the battleship missouri gun barrels onto the carfloat

59th and Rust

Hulett Ore Unloaders

Narragansett Bay Railway & Navigation Company

Offloading cars in Brooklyn with an SW1500

Unbelievable Workers | Working with Talented Engineers #46 #fail #adamrose #smartworkers

Richard Sieben Operations Car Floats On Chicago River

Willow Creek - Operations: Car Float Operations

The New York Jersey Rail Car Float Operation from NYC to New Jersey

Painting Track

Huletts & Coal Dumpers on Lake Erie

Märklin by Kappa - Porta Alpina 032 - Am 4/4 - Re 4/4 TEE - SBB Modelbahn

Walthers Railroad car float part 1

"Groan, Squeak & Screech" NYS&W FX Matt Brewery Utica NY

