Working a Carfloat

Some HD video of working the carfloat on my CNJ Bronx Terminal. This video shows the prototypical method for unloading a carfloat. Three of the six cars on the float are pulled off from one side of the float, then all 6 cars on the opposite side, these are stored in the yard. This helps equalize the balance of the float. Then, the three that were left on the outer track are pulled, followed by all the cars on the centre track. Two pulls are all that are required to empty the float. The locomotive has been re-worked with a new High Bass speaker installed by Lew White at Tony's Trains at the NMRA Convention in Hartford. The sound has also been improved with better samples, installed into the QSI Revolution decoder by Josh Shedaker, also at the convention.