THIS IS OUR FINAL VIDEO... Coach House Build COMPLETED!

We pick up work completed last episode which was fire door reveals and site tidy, then we compete the episode when we install the full kitchen: marking layouts, fitting base units, cutting for the Belfast sink, and using Space Plugs, Stud Buddy and GripIt fixings. I test long wall brackets and explain why I won’t use them again, fit end panels and wall cupboards. Dan plumbs the sink, taps and vanity unit. I use the Trend Cabinet Hardware Jig for handles and drawer fronts, fit plinths and timber worktops. Matt completes final plastering, insulation and concrete threshold work. We finish all remaining work, clear the whole site and reveal the completed space. Remaining work: final electrics after flooring laid, fit fridge door. We also reveal our next project. Tools featured: •⁠ ⁠Space Plugs •⁠ ⁠Stud Buddy •⁠ ⁠GripIt fixings •⁠ ⁠Trend Cabinet Hardware Drilling Jig