Windparks Minfeld und Gollenberg - mit neuen Vestas V162

In this video, I'm cycling through the Southern Palatinate. The first wind farm I visit is the Minfeld Wind Farm. There, a repowering project took place. Four older GE 1.5 turbines were replaced by two Vestas V162-6.0 turbines. The new turbines are already operational, while the old ones are still awaiting decommissioning. A Vestas V162-5.6 turbine was also installed last summer as an expansion at the Gollenberg Wind Farm. Enjoy the video! Comments and likes are always welcome! Subscribe to my channel to stay up-to-date! Instagram account: @ranger_jonas

Belecke Wind Farm - Enercon, Tacke, DeWind, WindWorld, Nordex, NEG Micon, AN Bonus Wind Turbines
▶︎

Belecke Wind Farm - Enercon, Tacke, DeWind, WindWorld, Nordex, NEG Micon, AN Bonus Wind Turbines

Falkenhöhe/Windkapf wind farm - with new Vestas V136 and 3 x Enercon E-138 under construction
▶︎

Falkenhöhe/Windkapf wind farm - with new Vestas V136 and 3 x Enercon E-138 under construction

Das zweite Leben der Windräder | ARTE Re:
▶︎

Das zweite Leben der Windräder | ARTE Re:

Angekommen, Abladen und Rückfahrt
▶︎

Angekommen, Abladen und Rückfahrt

Most Ridiculous Worker Mistakes Caught on Camera
▶︎

Most Ridiculous Worker Mistakes Caught on Camera

Windpark Kranenburg/Brobergen mit 4x Vestas V126/3600 & 1x Vestas V126/3450
▶︎

Windpark Kranenburg/Brobergen mit 4x Vestas V126/3600 & 1x Vestas V126/3450

Never Pay Your Electricity Bill Again | Build Your Own Hydroelectric Power Plant
▶︎

Never Pay Your Electricity Bill Again | Build Your Own Hydroelectric Power Plant

Repowering Rosskopf Wind Farm (Freiburg) - Part II: Rotor Blade Transport + Erection of Wind Turb...
▶︎

Repowering Rosskopf Wind Farm (Freiburg) - Part II: Rotor Blade Transport + Erection of Wind Turb...

Prechtaler Schanze wind farm - All three Enercon E-115 EP3 E3 turbines are erected
▶︎

Prechtaler Schanze wind farm - All three Enercon E-115 EP3 E3 turbines are erected

Repowering Reichenbach Steegen Wind Farm - Dismantling Vestas V80
▶︎

Repowering Reichenbach Steegen Wind Farm - Dismantling Vestas V80

Freiamt/Bildstock Wind Farm - E-138 in operation, E-175 under construction
▶︎

Freiamt/Bildstock Wind Farm - E-138 in operation, E-175 under construction

Prechtaler Schanze wind farm - Enercon E-115 EP3 E3 in operation
▶︎

Prechtaler Schanze wind farm - Enercon E-115 EP3 E3 in operation

The 90-Degree Torque Problem
▶︎

The 90-Degree Torque Problem

Abbau von 44 Stück Enercon E-66 Anlagen
▶︎

Abbau von 44 Stück Enercon E-66 Anlagen

Operation Windrad-Bau: So wird eine Windkraftanlage gebaut | Die Nordreportage | NDR Doku
▶︎

Operation Windrad-Bau: So wird eine Windkraftanlage gebaut | Die Nordreportage | NDR Doku

Repowering + Erweiterung im Windpark Rastenberg / 1× Vestas V162-6.0 und 1× Vestas V150-6.0 im Bau
▶︎

Repowering + Erweiterung im Windpark Rastenberg / 1× Vestas V162-6.0 und 1× Vestas V150-6.0 im Bau

How Wind Turbines Really Work: The Hidden Secrets
▶︎

How Wind Turbines Really Work: The Hidden Secrets

Compilatie van dronevideo's van windparken in Belgïe 🇧🇪 5.0
▶︎

Compilatie van dronevideo's van windparken in Belgïe 🇧🇪 5.0

Tidal Power: Unlocking the Greatest Untapped Energy Resource on the Planet | FD Engineering
▶︎

Tidal Power: Unlocking the Greatest Untapped Energy Resource on the Planet | FD Engineering

Farmer Built 2.5 kW Hydro Electric Pelton Turbine
▶︎

Farmer Built 2.5 kW Hydro Electric Pelton Turbine