The Faces of K-27 Deactivation
The K-27 Deactivation team has reached 96 percent completion as final activities to declare the building ready for demolition continue. To learn more about the K-27 Deactivation team and its work, watch the Faces of K-27 Deactivation video. As the team prepares for hand off to demolition crews, scheduled for early 2016, the critical work now focuses on verification walk downs. Similar to a construction project punch list, the verification walk down checklist confirms that all deactivation work has been completed including the removal of hazardous and radioactive materials and components that exceed onsite waste disposal limits. When walk downs identify conditions outside of the deactivation plan, crews take actions to correct the inconsistencies and achieve compliance. One of the final steps in the deactivation process will be declaring the building “crit incredible,” scheduled for late December. Crit incredible means all materials that could cause a nuclear criticality to occur have been removed.

The K-25 Story

The Frank Zappa Interview That Still Feels Dangerous Today (1984)

Why Nobody's Eating McDonald's Anymore

Nuclear waste is reusable. Why aren’t we doing it?

We Relocated the Handwheel on Our MONSTER Lathe | Megabore Lathe Setup

Journey to World’s First: The K-25 Story

The Problem with Stainless Steel

How Plutonium Is Made - The Most Dangerous Element

Most Ridiculous Worker Mistakes Caught on Camera

Why Blast Furnaces Were Insane: A Real Life Monster Story

Top 20 Most Quotable Monty Python Moments

Dangerous Grindstone Installation in 1971

The Factory That Built Big Muskie And Sent Men Into 13,800 Volts Of Danger

Viewing platform project gives understanding of historic K 25 Building

Deadly Dust: Explosions at Didion Milling

The History of Dynamite — The Explosive That Built the Modern World

Why Bulldozer Operator Was the Most Dangerous Seat in 1950s America

How Nuclear Power Works

Animation of 2015 Explosion at ExxonMobil Refinery in Torrance, CA

