Phá Tan Tòa B Hotel Trong Ngày - Cầu Trần Hưng Đạo Sừng Sững Vươn Cao.

Construction on the Tran Hung Dao bridge is continuing at a rapid pace. The B Hotel building has been demolished, and the entire site has been cleared and handed over to the bridge construction unit. Under the river, the bridge piers are rapidly rising above the floodwaters. All construction units are working day and night, determined to bring the bridge into operation on schedule... #cautranhungdao, #vankiep, #songhong, #bachdang, #duongbachdang.

Hanoi's 100-Year Master Plan – Part 1: How Will the Old Quarter, Historic Districts, and Red Rive...
▶︎

Hanoi's 100-Year Master Plan – Part 1: How Will the Old Quarter, Historic Districts, and Red Rive...

Siêu bão Ba Vì giật trên cấp 17: Đông Á đứng trước kịch bản như thảm họa Yagi ?
▶︎

Siêu bão Ba Vì giật trên cấp 17: Đông Á đứng trước kịch bản như thảm họa Yagi ?

100% thí sinh điểm thi Trường THPT Chuyên Tuyên Quang đồng ý thi lại môn Toán, có tổ chức thi lại?
▶︎

100% thí sinh điểm thi Trường THPT Chuyên Tuyên Quang đồng ý thi lại môn Toán, có tổ chức thi lại?

How Japan Built the Impossible 400 km Great Wall that You've Never Heard Of
▶︎

How Japan Built the Impossible 400 km Great Wall that You've Never Heard Of

Hunting for Signs of a River Monster in the Upper Dong Nai River | 10 Days and Nights of Jungle H...
▶︎

Hunting for Signs of a River Monster in the Upper Dong Nai River | 10 Days and Nights of Jungle H...

 BV Việt Đức Cơ Sở 2 Phủ Lý Hà Nam Chính Thức Mở Cửa Đón Bệnh Nhân
▶︎

BV Việt Đức Cơ Sở 2 Phủ Lý Hà Nam Chính Thức Mở Cửa Đón Bệnh Nhân

Dòng Nước Qúy Bổ Cập Ào Ào Cho Sông Tô Lịch.
▶︎

Dòng Nước Qúy Bổ Cập Ào Ào Cho Sông Tô Lịch.

Tiến độ CẦU TRẦN HƯNG ĐẠO (MỚI NHẤT) Tháng 7/2026 Công trường đại dự án
▶︎

Tiến độ CẦU TRẦN HƯNG ĐẠO (MỚI NHẤT) Tháng 7/2026 Công trường đại dự án

Nhiều Hãng Ô Tô Bất Ngờ Rút Khỏi Thị Trường Việt Nam Năm 2026
▶︎

Nhiều Hãng Ô Tô Bất Ngờ Rút Khỏi Thị Trường Việt Nam Năm 2026

Ring Road 2.5 Cau Giay Surprise: Site Clearance Continues to Expand, The Entire Route Has Changed...
▶︎

Ring Road 2.5 Cau Giay Surprise: Site Clearance Continues to Expand, The Entire Route Has Changed...

Building a £130k Kitchen Extension for £55,000 (Satisfying ASMR Timelapes)
▶︎

Building a £130k Kitchen Extension for £55,000 (Satisfying ASMR Timelapes)

Extremely Shantui Dozer Clearing Deep Mud & Pushing Sand! Massive Dump Trucks Sandfill Operation
▶︎

Extremely Shantui Dozer Clearing Deep Mud & Pushing Sand! Massive Dump Trucks Sandfill Operation

Surprising Prosperity of the Vietnamese Community in Savannakhet, Laos
▶︎

Surprising Prosperity of the Vietnamese Community in Savannakhet, Laos

Ring Road 2.5 in Khuong Dinh "Breaks Its Promise"! Thanh Xuan Still Faces Land Clearance Issues!
▶︎

Ring Road 2.5 in Khuong Dinh "Breaks Its Promise"! Thanh Xuan Still Faces Land Clearance Issues!

Cầu Metro Cần Giờ sẵn sàng khoan cọc nhồi, tổng độ sâu trụ chính 4.000 mét
▶︎

Cầu Metro Cần Giờ sẵn sàng khoan cọc nhồi, tổng độ sâu trụ chính 4.000 mét

Stunning New Median - Will the Hoang Cau - Voi Phuc Road Reach the Finish Line...?
▶︎

Stunning New Median - Will the Hoang Cau - Voi Phuc Road Reach the Finish Line...?

Urgent Update on Belt Road 1 Hoang Cau - Voi Phuc: Will It Open by September 2nd After Years of W...
▶︎

Urgent Update on Belt Road 1 Hoang Cau - Voi Phuc: Will It Open by September 2nd After Years of W...

The Biggest Construction Mistakes in the World
▶︎

The Biggest Construction Mistakes in the World

Breaking: Tran Hung Dao Bridge: How Far Along Is the First Box Girder Casting?
▶︎

Breaking: Tran Hung Dao Bridge: How Far Along Is the First Box Girder Casting?

When Will the Final 15km of the Hanoi Southern Axis Road (Cienco 5) Connecting to National Highwa...
▶︎

When Will the Final 15km of the Hanoi Southern Axis Road (Cienco 5) Connecting to National Highwa...