The incredible leaps of three decades of technology evolution! Chairlift comparison (part 1/3)
In this video series, I'm comparing two chairlifts that are 10m, but over three decades apart. They are located at Lauchernalp and the ski domain's deputy technical manager dedicated an entire day to show me around, let me film everywhere and explain each of the ropeways in great detail. In this part: 00:00 Introduction to the location and the chairlifts 03:15 The top stations 07:54 Clamps, clamps, clamps! 09:59 The bottom stations: Motors, breaks, emergency propulsion, counterweights 20:09 Teaser for part 2

▶︎
The incredible leaps of three decades of technology evolution! Chairlift comparison (part 2/3)

▶︎
What you didn't know about ropeways

▶︎
Why we put our cars on trains

▶︎
Awesome Ropeway Compilation (Zermatt)

▶︎
Doppelmayr/Garaventa - Construction of the 26-TGD "Eiger Express" Grindelwald, Switzerland (2020)

▶︎
The incredible leaps of three decades of technology evolution! Chairlift comparison (part 3/3)

▶︎
A train that never sees daylight

▶︎
Chairlift Destroy Crash Test

▶︎
This engine was considered state-of-the art for two decades - inside the fameous Re 425

▶︎
A 71: Neubau des Rennsteigtunnels (Dokumentation © 2004)

▶︎
The hidden depths where gondolas are sheltered for the night

▶︎
How China Is Building The World's Largest Dam In Africa

▶︎
De-mystifying a steam engine bottom-up

▶︎
The brute force approach to the impossible skilift problem: Poma lifts!

▶︎
The IMPOSSIBLE garaging that actually exists!

▶︎
MATTERHORN MEGA PROJECT: Building Europe’s Highest Cable Car | WELT Documentary

▶︎
Construction of the world's first TRI-Line in Hoch-Ybrig – 18-TGD Weglosen–Seebli (2025)

▶︎
Why Fixed Grips Are Better for Most of the Midwest! Pros/Cons of Highspeed Detachable vs. Fixed Grip

▶︎
Before Electricity: Inside a Traditional German Sawmill Part 1 | Handcrafted Windmill Restoration

▶︎
