Bauarbeiten Bornholmer Straße - Wollankstraße, Teil 1, 17.072620

Construction work is currently underway between Bornholmer Straße and Wollankstraße stations. Pile driving is being carried out in this area to lay the foundation for the new noise barrier. On the day of filming, two work trains were operating on this section of track. The train with the pile driver was pulled by V100SP-009, a V-100 East locomotive. The other was pulled by V100SP-025, a V-100 West locomotive. Both locomotives underwent extensive modernization at the Alstom plant in Stendal. Construction work is currently taking place between Bornholmer Straße and Wollankstraße stations. In this area, pile driving is being carried out to lay the foundation for the new noise barrier. On the day of filming, two work trains were operating on this section. The train with the pile driver was pulled by V100SP-009, and the other by V100SP-025, a V-100 West locomotive. Both locomotives were extensively modernized at the Alstom plant in Stendal. V100SP-009 CV: https://www.v100-online.de/index.php?... V100SP-025 CV: https://www.v100.de/index.php?nav=100...