Southbound and down
Off on a nice clean motorway job this time, bits of it were holding too much water during heavy rains so parts where to be lifted and cambered more to make the water shed faster, this involved removing some existing channel kerb and a new kerb line installed higher up to tie in with the new camber, some drainage repairs and upgrades where being carried out at the same time and in this video its just getting the trench boxes off the lorry, built up ready to use and then later ferrying them up to where the drainage job was to start, theres also some topsoil to peel back and relocate to go in behind where the new kerb line is going to be higher so that got placed in behind against the barrier and sealed up til later when the kerbs are in

▶︎
Stavební Úpravy Na Železnici a první SNÍH!!!

▶︎
Just keep on duckin

▶︎
Most Ridiculous Worker Mistakes Caught on Camera

▶︎
Timber Truckers: Surviving Total Isolation in Gabon | Deadliest Roads

▶︎
Abnormal Loads & Drivers At The Top Of Their Game - 12th June 2026

▶︎
Lifes a ditch (part 1)

▶︎
VN24 - Truck overturns on concrete barrier on A1 freeway - complex crane recovery

▶︎
Working on the Red Tractor: Engine Disassembly and Repair

▶︎
storm drainage

▶︎
Back to the stone age

▶︎
Summertime Ducking

▶︎
Total Idiots at Work Caught on Camera | Best of 2024

▶︎
We Took the Scania to an International Truck Dealer – Here’s What Happened

▶︎
HBM Grader mit Stehr Forstausrüstung für die Wegepflege

▶︎
CAT 335 next gen with @OilQuick back to work after vacation 🥳🥳. #cabview

▶︎
The Public Reacts! (S1E1) American Police Car on UK Roads

▶︎
Köp Hjulgrävmaskin Volvo EW160E med schaktvagn och välutrustad på Klaravik

▶︎
A crushing experiance

▶︎
Rescuing an Abandoned 28-Ton Crane That Hasn’t Moved in Years

▶︎
