Qatar Rail TBM
The Doha metro system construction works are phased over two stages, the first of which sees the construction of 3 out of 4 lines (Red, Gold, and Green) and 37 stations – with forecasts to open these lines to the public by late 2019. Most of the Doha Metro will be underground. Tunnelling works are being accomplished through the use of 21 Tunnel Boring Machines (TBMs).

▶︎
DOHA METRO | MSHEIREB TO WAKRAH RIDE FULL VIDEO

▶︎
Bahrain's North Manama Causeway; How to: Modern Causeway Construction Educational Film

▶︎
QATAR: The Kingdom That Shouldn't Exist

▶︎
Doha Metro - Qatar

▶︎
Doppelschild-TBM

▶︎
VDOT - HRBT: How a Tunnel-Boring Machine (TBM) Operates

▶︎
The $250 Billion Giga-Project: Gulf Railway Explained

▶︎
The Reality Of Doha Behind Luxury Hotels & Malls — First Impressions Of The Safest Country, Qatar 🇶🇦

▶︎
How Qatar Built a $36B Mega Metro Under the Desert

▶︎
The Dutch Are Planning Something Huge

▶︎
Doha, Metro making Tunnel -Boring Heavy Machines underground

▶︎
Inside the Impossible: How Qatar Built a $16 Billion Airport on the Sea

▶︎
Inside London’s £18BN New Railway

▶︎
Doha Metro

▶︎
Qatar Rail. Doha Metro. Red Line South. Building the Metro 1

▶︎
Doha Metro Red Line Train From Lusail QNB To Legtaifiya (06-19-2022) -Doha, Qatar

▶︎
Doha, Red Line North Underground: Tunnel Boring Machine Story

▶︎
قطر ريل -مترو الدوحة– مدينة متكاملة تحت الأرض

▶︎
Norway is Building The World's Deepest Mega-Tunnel

▶︎
